November 15, 2026·40 min read

IREN Limited (IREN), Financial Analysis

Insights derived from analysing SEC filings. Independent analysis, not a publication of the SEC.

Revenue Q1 FY2027
$228m
(5.0%) year on year (Q1 FY2026 $240m)
Costs and expenses Q1 FY2027
$414m
+31.0% year on year (Q1 FY2026 $316m)
Operating margin Q1 FY2027
(81.6%)
(49.9 pts) year on year (Q1 FY2026 (31.7%))
Key findings
  • Revenue $228m in Q1 FY2027 (quarter to 30 Sep 2026), (5.0%) year on year and +66% on Q4 FY2026 ($137m); AI Cloud $200m (87.7% of revenue), services $135m and lease $65m, against $71m in Q4 FY2026 and $7m a year earlier. Bitcoin Mining revenue fell to $28m from $233m as miners were decommissioned. Operating loss ($186m), net loss ($263m), diluted EPS ($0.66); adjusted EBITDA $66m.
  • Revenue backlog $20.3bn at 30 Sep 2026, +22% in the quarter, about two thirds with investment grade counterparties; RPO $6.35bn and remaining lease arrangements $13.96bn (10-Q). Microsoft accepted Horizon 1 in Aug 2026 under the $9.7bn agreement of Nov 2025; NVIDIA signed a $3.4bn five year contract in May 2026. Three unnamed customers, all in the AI Cloud segment, were 28%, 24% and 18% of Q1 FY2027 revenue (10-Q).
  • The more than $4bn ARR target is fully contracted and fully funded; it is now targeted to be operational by 31 Jan 2027 and may extend to the end of Feb 2027, against 31 Dec 2026 before, after a customer requested change and supplier timing (8-K Ex 99.1); the 10-Q reports a network design change requested by Microsoft across the Horizon deployments. Operating AI Cloud capacity was about 93MW at 30 Sep 2026 against 40MW at 30 Jun; the plan is 0.3GW (IT) for 2026 and 0.8GW (IT) by end 2027 on more than 5GW of secured power.
  • Capex $4.82bn in Q1 FY2027 (computer hardware $2.69bn) against operating cash flow $529m, which includes a $645m increase in deferred revenue from AI Cloud contracts. Debt $9.90bn against cash $3.52bn and restricted cash $2.26bn. Of $15bn of remaining planned FY2027 capex, $9bn is to be met from cash, committed GPU financing and contracted prepayments and $6bn from targeted financing subject to market conditions.
  • Post quarter contracts are priced higher: a five year contract at about $22m per MW (IT) with 90% of GPU capex prepaid and a short term contract at $40m per MW; pricing on 3 and 5 year deals signed in Q4 FY2026 and Q1 FY2027 rose 11% and 12%. Bitcoin mining is to be substantially wound down by 31 Dec 2026.
  • Shares closed at $18.17 on 13 Nov 2026, 73.2% below the 52 week closing high of $67.84 (27 May 2026). EV/Sales 17.0x TTM revenue of $694.7m. Scenario prices three years forward on this report's own growth and exit EV/Sales assumptions: base $36.34, best $85.13, worst $9.41.

Figures are read from the Q1 FY2027 Form 8-K of 5 Nov 2026 (Item 2.02, Ex 99.1, acc 0001878848-26-000065) and the Form 10-Q for the quarter to 30 Sep 2026 filed the same day (acc 0001878848-26-000066), the FY2026 and FY2025 Forms 10-K, the Forms 10-Q for Q2 and Q3 FY2026, and the Forms 8-K with all their exhibits from Nov 2025 to Nov 2026, incl. the Microsoft agreement, the convertible note indentures, the GPU financing agreements, the Dell purchase agreements and the filed Q3 FY2026 call transcript. IREN is an Australian company that has filed US domestic forms since FY2025. IREN files no separate CFO commentary; the 10-Q MD&A and the CFO remarks in the filed transcript are used. Ownership comes from the DEF 14A of 13 Oct 2026 and Forms 4; peer figures from each peer's own filings. Share price $18.17 is the regular session close of 13 Nov 2026. Accession numbers appear in the Sources appendix.

1 Revenue & Business Model

  • Storyline: IREN is moving its data centers from Bitcoin mining to GPU cloud services; AI Cloud revenue rose from $16.4m in FY2025 to $128.8m in FY2026 and $200m in Q1 FY2027 alone, while capex rose to $4.82bn a quarter. Chapters 2 to 5 cover the four revenue drivers: AI Cloud contracts, capacity and GPUs, capex and financing, and the Bitcoin mining wind down.
  • Two segments: AI Cloud (bare metal and managed GPU cloud for AI training and inference; from Q1 FY2027 split into AI Cloud Services and AI Cloud Lease) and Bitcoin Mining. IREN owns the land, grid connections, substations and buildings at its sites in British Columbia, Texas, Oklahoma, Spain and Australia (10-K).
  • Revenue FY2023 $75.5m, FY2024 $187.2m, FY2025 $501.0m, FY2026 $707.0m; TTM $694.7m. FY2026 net loss ($702.6m) included impairments of $638.8m, mainly Bitcoin miners retired as sites convert to AI Cloud.
  • Revenue by country (10-Q): Q1 FY2027 Canada $118m, US $72m, Australia $30m and other $8m; Bitcoin revenue is booked in Australia, so Q1 FY2026 was Australia $233m and Canada $7m.
  • Project pipeline (10-K, gross MW): Childress 750, Sweetwater 1 1,400, Sweetwater 2 600, Kiowa 1,600, Bundey 800, Badajoz 300, Mackenzie 80, Prince George 50, Canal Flats 30. Employees 685 at 30 Jun 2026 plus about 580 from Mirantis (Aug 2026).
Figure 1.1 Revenue and operating margin, FY2023 to TTM Q1 FY2027
Figure 1.2 Revenue by segment, FY2024 to FY2026 ($m)
Table 1.1 Segment revenue, adjusted EBITDA and net income, last seven quarters
LineQ3 FY2025Q4 FY2025Q1 FY2026Q2 FY2026Q3 FY2026Q4 FY2026Q1 FY2027
Total revenue ($m)144.8187.3240.0184.7144.8137.2228.0
AI Cloud revenue ($m)3.67.07.017.333.670.5200.0
Bitcoin Mining revenue ($m)141.2180.3233.0167.4111.266.728.0
AI Cloud share of revenue (%)2.53.72.99.423.251.487.7
Adjusted EBITDA ($m)n/an/a92.075.359.519.266.0
Net income (loss) ($m)(16.1)176.7385.0(155.4)(247.8)(684.0)(263.0)
Q3 and Q4 FY2025 derived from nine month and annual filings. Q1 FY2026 and Q1 FY2027 at $1m precision as filed in the Q1 FY2027 10-Q; Q2 to Q4 FY2026 at $0.1m precision as filed at the time (the Q1 FY2027 Ex 99.1 rounds Q4 FY2026 to $137m, $71m and $67m, the basis for quarter on quarter changes in the text). Adjusted EBITDA is non GAAP; not collected for FY2025 quarters.

2 AI Cloud Contracts: $200m Quarterly Revenue, $20.3bn Backlog and the $9.7bn Microsoft Agreement

  • AI Cloud revenue $200m in Q1 FY2027 against $71m in Q4 FY2026 (+182%) and $7m a year earlier; services $135m and lease $65m (Q4 FY2026: $71m and nil). FY2026 AI Cloud revenue was $128.8m against $16.4m.
  • Backlog $20.3bn: RPO $6.35bn plus remaining contracted lease arrangements $13.96bn (10-Q Note 4), about two thirds with investment grade counterparties (8-K Ex 99.1); at 30 Jun 2026 RPO plus contracted lease payments were $16.6bn (10-K).
  • Named contracts: Microsoft about $9.7bn over a five year average term (Nov 2025); NVIDIA $3.4bn over five years (May 2026); $2.8bn with AI developers (Jul 2026). Customers named in releases include Perplexity, Figure AI, Together AI, Fluidstack, Fireworks AI, Fal AI, Hume AI, Cohere and Higgsfield AI.
  • ARR path: $3.4bn target (Feb 2026), $3.1bn contracted and $3.7bn target (May), more than $4bn target with about 85% contracted (Jul), $4bn contracted and $1bn operating (Aug), more than $4bn fully contracted and funded (Nov 2026).

How demand from hyperscalers and AI labs is changing

  • Cloud backlogs: 30 Sep 2026: Microsoft commercial RPO $677bn (+73%) and Google Cloud backlog $560.8bn; Oracle RPO $664bn (+45.9%) at 31 Aug 2026 (Forms 10-Q).
  • CoreWeave: 30 Sep 2026: CoreWeave RPO $132.3bn, 36% expected within 24 months; two customers were 30% and 24% of its Q3 2026 revenue (10-Q).
  • Nebius: 30 Sep 2026: Nebius RPO $38.7bn, 40% within 24 months; three customers were 33%, 22% and 15% of Q3 2026 revenue (6-K Ex 99.2).
  • IREN: Q1 FY2027: IREN's three largest customers were 28%, 24% and 18% of revenue; about two thirds of the $20.3bn backlog is with investment grade counterparties (10-Q, 8-K).
Figure 2.1 AI Cloud and Bitcoin revenue by quarter
Figure 2.2 Backlog and named contract values
Table 2.1 AI cloud providers compared, latest filed quarter
Company and linePeriodRevenueGrowth (%)Margin (%)Detail
IREN AI CloudSep 2026 quarter$200m2,757.186 (segment, before D&A)backlog $20.3bn
CoreWeave total revenueQ3 2026$3.66bn168.35.7RPO $132.3bn
Nebius AI cloudQ3 2026$973.8m642.8n/aRPO $38.7bn
Microsoft AzureSep 2026 quarter$33.17bn48.2n/aCommercial RPO $677bn (+73%)
Alphabet Google CloudQ3 2026$30.71bn102.636.2Backlog $560.8bn
Amazon AWS segmentQ3 2026$45.98bn39.338.7AWS operating income $17.8bn
Oracle Cloud Infrastructure (OCI)Aug 2026 quarter$7.39bn120.7n/aRPO $664bn (+45.9%)
IREN margin is AI Cloud segment gross margin before D&A; AWS and Google Cloud segment operating margins; CoreWeave GAAP operating margin; Nebius growth is against AI cloud revenue of $131.1m in Q3 2025; Q3 2026 includes $325.1m of strategic partnership revenue. IREN growth is against $7m in Q1 FY2026 (10-Q, $1m precision).

3 Capacity, GPUs and Power: 93MW Operating, 0.3GW for 2026, More Than 5GW Secured

  • Operating AI Cloud capacity about 93MW at 30 Sep 2026 against 40MW at 30 Jun; a Jul 2026 release says IREN grew from about 3MW of self built AI Cloud capacity a year earlier to 480MW being delivered in 2026.
  • GPUs: installed and on order AMD MI350X and NVIDIA H100, H200, B200, B300, GB300 and VR200 systems (10-K); 150,000 GPUs targeted for 2026 (Q3 FY2026 call transcript, May 2026). Horizon 1 earned NVIDIA Exemplar Cloud status for GB300 NVL72.
  • Power: about 5GW of executed grid connection agreements in the US, Canada, Spain and Australia; the 2GW Sweetwater hub is conditionally included in ERCOT Batch Zero as base load; development pipeline above 35GW, which the release calls speculative.
  • Targets: 0.3GW (IT) cumulative in 2026 supporting the more than $4bn ARR and 0.8GW (IT) by end 2027; the May 2026 release listed Childress Horizons 5 and 6, Childress air cooled capacity and a first Sweetwater 1 phase for 2027, and new liquid cooled halls are under construction at Mackenzie.

How power and data center supply is changing

  • CoreWeave: 30 Sep 2026: CoreWeave active power above 1.7 GW and contracted above 4.6 GW (8-K Ex 99.1, 10 Nov 2026).
  • Nebius: Nov 2026: Nebius reports more than 4 GW of contracted power and targets 5 GW at end 2026 (6-K Ex 99.2).
  • Landlords: 7 Oct 2026: Applied Digital holds leases for about 1.41 GW of critical IT load worth about $36bn (8-K Ex 99.1).
  • Texas: Aug 2026: the Texas Governor ordered a verification and audit of all data centers in the ERCOT interconnection process; ERCOT set Batch Zero classifications (IREN 10-K FY2026).
  • New York: Jul 2026 (CoreWeave 10-Q): a New York executive order pauses for up to one year discretionary state permits for new or expanded data centers of 50 MW or more.
Figure 3.1 IREN AI Cloud capacity, actual and targets
Figure 3.2 Power measures by company
Table 3.1 Capacity measures compared
CompanyMeasureDateValueDetail
CoreWeaveActive power30 Sep 20261,700 MWcontracted above 4.6 GW
NebiusContracted powerNov 20264,000 MW5 GW targeted at end 2026
Applied DigitalLeased critical IT loadOct 20261,410 MWlease value about $36bn
IRENOperating AI Cloud capacity30 Sep 202693 MWmore than 5 GW secured; 0.8 GW (IT) targeted by end CY2027
Measures differ: active, contracted, leased and operating capacity are not one to one comparable; IREN operating capacity excludes Bitcoin sites.

4 Capex and Financing: $4.8bn Quarterly Capex, $9.9bn of Debt and $15bn Still to Spend in FY2027

  • Capex $4.82bn in Q1 FY2027 against $0.28bn a year earlier; FY2026 capex $4.33bn against $1.37bn. Remaining planned FY2027 capex from 30 Sep 2026 is $15bn incl. data centers and GPUs.
  • Funded part ($9bn): cash, restricted cash, undrawn committed GPU financing and contracted prepayments not yet received; targeted part ($6bn): further GPU financing, prepayments, data center financing and corporate sources, subject to market conditions.
  • Cost of debt: Microsoft GPU financing at 5.96% (notes) and SOFR + 2.25% (DDTL), about 6.0% weighted; Mackenzie at 9.0%; Prince George at 9.51%; convertible coupons 0% to 3.50%.
  • Equity: $3.7bn of ATM sales by 30 Oct 2026; shares outstanding 424.4m against 270.7m weighted basic shares in Q1 FY2026.

How AI infrastructure spending and financing are changing

  • Hyperscaler capex: Q3 2026: Microsoft ($39.4bn, +103%), Alphabet ($51.4bn, +114%) and Amazon ($77.3bn) capex; Oracle $28.5bn (+235%) in its Aug 2026 quarter (company filings).
  • CoreWeave: 30 Sep 2026: CoreWeave debt $46.9bn and Q3 2026 interest expense $846m (8-K Ex 99.1, 10-Q).
  • Nebius: 30 Sep 2026: Nebius debt carrying amount $14.19bn; Q3 2026 capex $7.30bn (6-K).
  • IREN: May 2026: IREN's $3.6bn Microsoft GPU financing pays 5.96% on the notes and SOFR + 2.25% on the DDTL; the Aug 2026 Mackenzie financing pays 9.0% (8-K, 10-Q).
Figure 4.1 Quarterly capital expenditure by company
Table 4.1 Capital expenditure compared, latest filed quarter
CompanyPeriodCapexDetail
IRENSep 2026 quarter$4.82bndebt $9.90bn; commitments $18.95bn
CoreWeaveQ3 2026$9.44bndebt $46.9bn; interest expense $846m
NebiusQ3 2026$7.30bndebt carrying amount $14.19bn
MicrosoftSep 2026 quarter$39.37bnTTM capex $135.9bn
AlphabetQ3 2026$51.36bn+114.4% year on year
AmazonQ3 2026$77.30bnTTM capex $215.2bn
OracleAug 2026 quarter$28.50bn+235.2% year on year
Cash capex as each company files it. Microsoft quarter to 30 Sep 2026; Oracle quarter to 31 Aug 2026.

5 Bitcoin Mining Wind Down: $28m of Revenue, 402 BTC and 8.8 EH/s

  • Bitcoin Mining revenue $28m in Q1 FY2027 ((88.0%) year on year) against $67m in Q4 FY2026; FY2026 Bitcoin revenue was $578.2m against $484.6m as average operating hashrate rose to 36.5 EH/s from 25.7 EH/s.
  • 402 BTC mined against 2,039; average operating hashrate 8.8 EH/s against 45.3 EH/s. Installed capacity fell to 7.9 EH/s (about 180MW) from 23.2 EH/s (about 380MW) at 30 Jun 2026.
  • Impairments: $638.8m in FY2026 ($450.4m in Q4) and $2m in Q1 FY2027, mainly miners retired as sites convert; miners held for sale lost $21m of fair value in Q1 FY2027.
  • Plan: substantially complete the transition by 31 Dec 2026, with immaterial mining through CY2027; IREN sells mined Bitcoin daily and held none at 30 Sep 2026.

How Bitcoin miners are changing

  • MARA: Q3 2026: MARA mined 2,247 BTC with 71.2 EH/s energized and held 34,012 BTC (10-Q).
  • Riot: Q3 2026: Riot mined 1,637 BTC on 44.9 EH/s and announced a 910 MW Corsicana lease (10-Q).
  • Cipher Digital: Q3 2026: Cipher Digital mined only at Odessa after converting Black Pearl to HPC; first lease revenue in Aug 2026 (10-Q).
  • Protocol: Apr 2024: the block reward halved to 3.125 BTC; the next halving is expected in Apr 2028 (IREN 10-Q).
Figure 5.1 IREN Bitcoin revenue by quarter
Figure 5.2 Bitcoin mining revenue by company
Table 5.1 Bitcoin mining compared, latest filed quarter
CompanyPeriodRevenueGrowth (%)Detail
MARAQ3 2026$164.2m(34.9%)2,247 BTC mined; 71.2 EH/s
Riot PlatformsQ3 2026$116mn/a1,637 BTC mined; 44.9 EH/s deployed
CleanSparkJun 2026 quarter$138m(30.5%)42.6 EH/s average in Jun 2026
Cipher DigitalQ3 2026$20.8m(70.9%)mining only at Odessa after Black Pearl conversion to HPC
IRENSep 2026 quarter$28m(88.0%)402 BTC mined; 8.8 EH/s average
MARA figure is total revenue; others Bitcoin mining revenue. CleanSpark quarter to 30 Jun 2026.

6 Financial Analysis & Ratios

  • Operating margin TTM (166.4%) against 3.5% in FY2025; costs grew with depreciation of new GPUs, SG&A and impairments while Bitcoin revenue fell.
  • Net loss TTM ($1.35bn) includes impairments of $624.6m and the $111.8m debt conversion inducement of Q2 FY2026; P/E is not used.
  • Free cash flow TTM ($6.39bn): operating cash flow $2.49bn less capex $8.88bn. Operating cash flow includes customer prepayments; deferred revenue was $2.54bn at 30 Sep 2026 against $1.84bn at 30 Jun.
  • Balance sheet at 30 Sep 2026: cash $3.52bn plus restricted cash $2.26bn; property, plant and equipment $12.34bn (30 Jun: $6.75bn); goodwill $450m after Mirantis; accounts payable $2.58bn; debt $9.90bn; equity $5.12bn.
  • Capital raised since Nov 2025: convertible notes of $2.3bn (Dec 2025) and $3.0bn (May 2026); ATM sales of $3.7bn gross by 30 Oct 2026; GPU financings of $3.6bn (Microsoft), $2.4bn (Mackenzie) and $363m (Prince George). No dividends or buybacks.
Table 6.1 Income statement, cash flow and balance sheet summary ($m unless stated)
Line itemFY2023FY2024FY2025FY2026TTM Q1 FY2027
Revenue75.5187.2501.0707.0694.7
Gross profit36.1100.1342.0487.3509.7
Research and development0.00.00.00.07.0
Selling, general and administrative49.070.4136.5449.1527.9
Operating income(157.2)(27.2)17.3(1,046.7)(1,156.3)
Net income(171.8)(28.9)86.9(702.6)(1,350.2)
Diluted EPS ($)(3.14)(0.29)0.39(2.22)n/a
Operating cash flow5.752.2245.92,100.42,487.0
Capital expenditure(116.1)(479.9)(1,372.6)(4,333.1)(8,876.6)
Free cash flow(110.4)(427.7)(1,126.7)(2,232.7)(6,389.6)
Stock based compensation14.423.642.6205.0238.6
Cash and investments68.9404.6564.57,619.65,778.0
Total debtn/a0.0962.87,593.09,897.0
Total equity305.41,097.51,817.54,185.65,116.0
Capex is cash payments for property, plant and equipment and computer hardware; intangibles and deposits excluded. Debt is carrying amount excl. finance leases. Cash includes restricted cash. FY2023 to FY2026 from the Forms 10-K; TTM equals Q2 FY2026 to Q1 FY2027.
Figure 6.1 Quarterly revenue and margins
Table 6.2 What changed, Q1 FY2027 against Q1 FY2026
MetricQ1 FY2026Q1 FY2027Change
Revenue ($m)240.0228.0(5.0%)
Gross profit ($m)159.0182.014.5%
Operating income ($m)(76.0)(186.0)(144.7%)
Net income ($m)385.0(263.0)n/a
Diluted EPS ($)1.08(0.66)n/a
Operating cash flow ($m)142.0529.0272.5%
Free cash flow ($m)(138.0)(4,295.0)n/a
Operating margin (%)(31.7)(81.6)(49.9 pts)
Net margin (%)160.4(115.4)(275.8 pts)
Table 6.3 Ratio analysis
RatioFY2023FY2024FY2025FY2026TTM Q1 FY2027
Growth and margins
Revenue growth (%)n/a147.9167.641.1n/a
Gross margin (%)47.853.568.368.973.4
Operating margin (%)(208.2)(14.5)3.5(148.0)(166.4)
Net margin (%)(227.5)(15.4)17.3(99.4)(194.4)
FCF margin (%)(146.2)(228.5)(224.9)(315.8)(919.8)
Cost and investment intensity
R&D (%) revenue0.00.00.00.01.0
SBC (%) revenue19.112.68.529.034.3
Capex (%) revenue153.8256.4274.0612.91,277.8
Returns
ROE (%)(56.3)(4.1)6.0(23.4)(26.4)
ROA (%)n/a(2.5)4.2(7.5)(6.6)
Asset turnover (x)n/a0.160.170.040.03
Liquidity and leverage
Current ratio (x)n/a8.854.293.551.60
Debt to equity (x)n/a0.000.531.811.93
Net cash ($bn)0.10.4(0.4)0.0(4.1)
Efficiency and cash quality
Days sales outstandingn/a0111101
Gross margin excludes depreciation and amortization. FY2023 balance sheet partly not filed in the 10-K years shown.
Figure 6.2 Margin profile
Figure 6.3 Operating cash flow, capital expenditure and free cash flow
Table 6.4 Valuation snapshot at $18.17 per share, 13 Nov 2026
MeasureValue
Market cap ($bn)7.7
Enterprise value ($bn)11.8
EV/Sales (TTM) (x)17.0
FCF yield (%)(82.9)
Price/Book (x)1.5

Cost structure and profitability

  • Costs (revenue less operating income) $414m in Q1 FY2027, +31.0%, against revenue (5.0%); operating margin (49.9) pts year on year.
  • Depreciation and amortization 64.9% of revenue against 35.4% a year earlier, from GPUs placed in service and Childress capacity, partly offset by lower miner depreciation.
  • Cost of revenue 20.2% of revenue against 33.8%: AI Cloud cost $28m on $200m of revenue, Bitcoin $18m on $28m; electricity for mining fell $61m.
  • SG&A 95.2% of revenue against 57.5%; stock based compensation $106m. Cash operating expense (SG&A and R&D less stock based compensation) $118m against $85m in Q4 FY2026.
Figure 6.4 Operating cost lines as % of revenue by quarter
Figure 6.5 GAAP operating income and adjusted EBITDA by quarter
Table 6.5 Costs as % of revenue, last five quarters
LineQ1 FY2026Q2 FY2026Q3 FY2026Q4 FY2026Q1 FY2027
Cost of revenue, excl. D&A (% of revenue)33.835.627.624.320.2
Selling, general and administrative (% of revenue)57.554.656.593.595.2
Depreciation and amortization (% of revenue)35.453.783.781.764.9
Impairment of assets (% of revenue)6.717.297.0328.30.9
Stock based compensation (incl. above) (% of revenue)30.031.521.831.346.5
Operating income (loss) (% of revenue)(31.7)(63.0)(161.3)(452.2)(81.6)
Finance expense (% of revenue)3.85.810.217.932.0

Cash flow, debt and capital expenditure

  • Debt principal about $10.36bn by instrument at 30 Sep 2026 incl. finance leases; carrying amount $9.90bn plus leases $311m against $7.59bn and $244m at 30 Jun 2026.
  • Finance expense by quarter from Q3 FY2025: $4.1m, $5.2m, $9.0m, $10.7m, $14.8m, $24.5m, $73.0m. Cash interest paid $34m in Q1 FY2027.
  • Operating cash flow and prepayments: $1.81bn in Q4 FY2026 and $529m in Q1 FY2027, with deferred revenue up $1.72bn and $645m; prepayments on recent contracts cover 45% to 90% of GPU capex (8-K exhibits).
  • Capex: $1.36bn, $1.98bn and $4.82bn in Q3 FY2026 to Q1 FY2027; capex incurred but unpaid $2.49bn at 30 Sep 2026.
Figure 6.7 Operating cash flow and capital expenditure by quarter
Figure 6.8 Debt principal by instrument
Table 6.6 Debt and leases by instrument, 30 Sep 2026
InstrumentRateMaturityPrincipal or amount
Convertible notes (six series)0% to 3.50%Dec 2029 to Dec 2033$6.75bn
GPU Financing 1.0, USPP notes (Microsoft)5.96%Dec 2031$1.58bn
GPU Financing 1.0, DDTL (Microsoft)SOFR + 2.25%Dec 2031$413m
GPU Financing 2.0 (Mackenzie)9.0%30 month amortization$947m
GPU Financing 3.0 (Prince George)9.51%36 months from Sep 2026$363m
Finance leases (GPU hardware)n/alease terms$311m
10-Q MD&A and Note 19. GPU Financing 1.0 notes include $1.05bn held in escrow at 30 Sep 2026; $525m released on 1 Oct 2026.

7 MD&A & Management Commentary

Q1 FY2027 results: Form 8-K and Form 10-Q of 5 Nov 2026

  • Revenue $228m: AI Cloud Services $135m (Q1 FY2026: $7m) from new customers, capacity and Mirantis from 3 Aug 2026; AI Cloud Lease $65m from contracts accounted for as leases incl. Microsoft after Horizon 1 acceptance; Bitcoin $28m.
  • Bitcoin (10-Q): 402 BTC mined against 2,039; volume cut revenue by $116m and a lower Bitcoin price by $89m. Average operating hashrate 8.8 EH/s against 45.3 EH/s; installed capacity 7.9 EH/s (about 180MW) at 30 Sep 2026.
  • Costs: SG&A $217m against $138m, with stock based compensation +$33m and employee costs +$24m, offset by $27m lower payroll tax accruals; D&A $148m against $85m; R&D $7m (Mirantis); finance expense $73m against $9m; interest income $51m.
  • Profit lines: operating loss ($186m) against ($76m); adjusted EBITDA $66m (28.9%) against $92m; net loss ($263m) against net income $385m, which included a $665m unrealized gain on financial instruments.
  • Cash and commitments: operating cash flow $529m; hardware payments $2.69bn and other property payments $2.13bn; financing inflows $2.36bn of debt and $498m of shares. Commitments $18.95bn at 30 Sep 2026 against $13.81bn at 30 Jun; Dell purchase orders of about $6.7bn signed on 28 Sep 2026 for delivery from H2 2027.
  • Other: in Oct 2026 US Customs approved IREN's protests on the origin of imported Bitcoin miners, so the up to about $100m of potential tariffs is not payable.
Table 7.1 Targets as filed, with 2026 revisions
ItemOutlookSource
AI Cloud ARR targetmore than $4bn operational by 31 Jan 2027, may extend to end Feb 2027 (moved from 31 Dec 2026)8-K Ex 99.1, 5 Nov 2026
ARR target history$3.4bn by end CY2026 (Feb 2026); $3.7bn (May 2026); more than $4bn (20 Jul 2026)8-K Ex 99.1, 5 Feb, 7 May and 20 Jul 2026
Remaining FY2027 capex from 30 Sep 2026$15bn: $9bn from cash, committed GPU financing and prepayments; $6bn targeted from new financing8-K Ex 99.1, 5 Nov 2026
Data center capacity0.3GW (IT) cumulative in 2026; 0.8GW (IT) by end CY20278-K Ex 99.1, 27 Aug and 5 Nov 2026
Horizon 2 to 4 for Microsofttargeted for calendar Q4 2026; grace periods run to the beginning of calendar Q2 202710-K FY2026
Bitcoin miningtransition substantially complete by 31 Dec 2026; immaterial mining through CY202710-Q Q1 FY2027

Management and CFO commentary

  • IREN files no CFO commentary document; the points below come from the 10-Q MD&A, results releases and the filed Q3 FY2026 call transcript.
  • Q1 FY2027 release, Co‑CEO Daniel Roberts: Horizon 1 in service for Microsoft with NVIDIA Exemplar status; AI Cloud revenue nearly tripled to $200m; operating ARR doubled to $1bn; more than $4bn ARR now targeted for January.
  • Q1 FY2027 10-Q MD&A: cash $3.52bn and restricted cash $2.26bn; finance expense $73m against $9m; commitments $18.95bn; Microsoft requested a network design change across the Horizon deployments.
  • FY2026 release (27 Aug 2026): 2026 capacity largely sold out; 3 year contracts above $20m revenue per MW (IT) with about a 2 year payback; active talks at about $25m per MW; prepayments 45% to 55% of GPU capex.
  • Q3 FY2026 call, CFO Anthony Lewis (filed transcript): cash $2.6bn at 30 Apr 2026; about 95% of Microsoft GPU capex funded by prepayments and GPU financing; GPU capex to be funded with secured debt and prepayments.
  • Q2 FY2026 release (5 Feb 2026): $3.6bn GPU financing secured for the Microsoft contract; with the $1.9bn Microsoft prepayment it covers 95% of GPU capex.
Table 7.2 Management statements in their own words
SpeakerDate and sourceStatement
Daniel Roberts, Co‑Founder and Co‑CEO5 Nov 2026, 8-K Ex 99.1“We own the land, the power and the data centers under all of it”
Daniel Roberts, Co‑Founder and Co‑CEO27 Aug 2026, 8-K Ex 99.1“Our 2026 capacity is largely sold out.”
Daniel Roberts, Co‑Founder and Co‑CEO7 May 2026, 8-K Ex 99.1“The world is structurally short compute”
Table 7.3 Key disclosures in the FY2026 10-K and the Q1 FY2027 10-Q
ItemDisclosure
10-K FY2026, resultsRevenue $707.0m (AI Cloud $128.8m, Bitcoin $578.2m); operating loss $(1,046.7)m; net loss $(702.6)m incl. $638.8m impairments and a $558.5m unrealized gain on financial instruments.
10-K FY2026, MicrosoftTotal contract value about $9.7bn through 2031, five year average term, four tranches at Childress; 20% of each tranche prepaid; Horizon 2 to 4 targeted for calendar Q4 2026 with grace periods to early Q2 2027.
10-K FY2026, capacityOperating AI Cloud capacity about 40MW and installed Bitcoin capacity 23.2 EH/s (about 380MW) at 30 Jun 2026; about 5GW of grid connection agreements.
10-K FY2026, commitmentsCommitments $13.81bn at 30 Jun 2026 against $368.8m a year earlier; RPO plus contracted lease payments $16.6bn.
10-K FY2026, NVIDIAStrategic partnership for up to 5GW of DSX aligned infrastructure; NVIDIA right to invest up to $2.1bn in ordinary shares, subject to delivery of up to 600,000 GPUs and regulatory conditions.
10-Q Q1 FY2027, revenueRPO $6.35bn plus remaining lease arrangements $13.96bn; deferred revenue $2.54bn; top three customers 28%, 24% and 18% of revenue.
10-Q Q1 FY2027, financingGPU Financing 1.0 ($3.65bn commitments; $413m DDTL and $1.58bn notes issued, $1.05bn in escrow), 2.0 ($947m funded of $2.45bn, 9.0%) and 3.0 ($363m, 9.51%).
10-Q Q1 FY2027, equityATM: 59,431,312 shares for about $3.0bn gross by 30 Sep 2026 and 76,806,302 shares for about $3.7bn by 30 Oct 2026; 424,357,381 shares outstanding.
10-Q Q1 FY2027, risk factorsNo material change to the FY2026 10-K risk factors.

8 Peer Valuation & Sector Summary

  • Sector: AI cloud infrastructure. IREN names AWS, Google Cloud, Microsoft Azure and Oracle Cloud as well as CoreWeave, Nebius, Crusoe, Lambda, Nscale and SpaceX as competitors (10-K); Microsoft and NVIDIA are also customers.
  • Growth, latest quarter year on year: IREN (5.0)% (AI Cloud +2,757%), NBIS 571.3%, CRWV 168.3%, GOOGL 24.7%, AMZN 12.1%, ORCL 29.6% (quarter to 31 Aug 2026), MSFT 18.8% (company totals).
  • Operating margin TTM: MSFT 47.1%, GOOGL 33.3%, ORCL 32.1%, AMZN 13.1%, CRWV (0.8%), NBIS (23.0%), IREN (166.4%).
  • Valuation, EV/Sales TTM: NBIS 21.5x, IREN 17.0x, MSFT 11.1x, GOOGL 7.2x, CRWV 7.1x, ORCL 6.8x, AMZN 3.3x. Net debt: IREN $4.12bn, NBIS $6.8bn, CRWV $42.7bn.
Table 8.1 Peer comparison, latest reported trailing twelve months
CompanyRevenue TTM ($bn)Revenue growth (%)Gross margin (%)Operating margin (%)Net margin (%)FCF margin (%)ROE (%)Net cash ($bn)Market value ($bn)EV/Sales (x)P/E TTM (x)
IREN, TTM Sep 20260.7(5.0)73.4(166.4)(194.4)(919.8)(26.4)(4.1)817.0n/a
CRWV, TTM Sep 20269.9168.366.7(0.8)(25.6)(206.6)(62.8)(42.7)277.1n/a
NBIS, TTM Sep 20262.2571.376.0(23.0)5.7(567.2)n/a(6.8)4021.5n/a
MSFT, TTM Sep 2026346.418.867.747.141.217.334.229.03,88411.127.2
AMZN, TTM Sep 2026797.512.151.413.116.9(5.3)26.3(66.1)2,5993.319.3
GOOGL, TTM Sep 2026471.124.760.933.350.04.244.3139.03,5437.215.1
ORCL, TTM Aug 202671.829.664.032.126.4(40.0)43.4(88.3)3966.820.9
Each row label gives the end of the TTM period; growth is the latest quarter year on year (IREN quarter to 30 Sep 2026, MSFT quarter to 30 Sep 2026, ORCL quarter to 31 Aug 2026, others Q3 2026). IREN at the 13 Nov 2026 close; CRWV at its 10 Nov 2026 close; NBIS at its 12 Nov 2026 close; MSFT, AMZN, GOOGL and ORCL from their own filings with price dates of 29 or 30 Oct 2026. Gross margins of IREN, CRWV and NBIS exclude most D&A. Net cash excludes leases.
Figure 8.1 Revenue growth versus operating margin, peer set

9 Material Events & Contracts

  • 21 Forms 8-K from 24 Nov 2025 to 5 Nov 2026: four results releases, three convertible note issues and their launches, the Microsoft GPU financing, three Dell GPU purchase agreements, the ATM program, the auditor change and the Co‑CEO equity grants.
  • Convertible terms: Dec 2025 notes convert at about $51.40 (capped calls to $82.24); May 2026 notes at about $73.07 (capped calls to $110.30). The Dec 2025 proceeds were also used to repurchase $227.7m of 2030 and $316.6m of 2029 notes.
  • Equity: the ATM program of Mar 2026 allows up to $6.0bn of ordinary shares; NVIDIA holds a five year right to buy 30m shares at $70; 11,981,668 shares were issued in the Mirantis acquisition.
Table 9.1 Forms 8-K, 24 Nov 2025 to 5 Nov 2026
DateItemsEvent
24 Nov 20255.07, 3.032025 AGM (19 Nov 2025): all 10 proposals approved, incl. constitution changes and the 2025 Omnibus Incentive Plan
28 Nov 20254.01KPMG LLP appointed auditor from 27 Nov 2025; Raymond Chabot Grant Thornton dismissed
1 Dec 20258.01Launch of convertible note offering and registered direct share offering to fund repurchase of 2029 and 2030 notes
3 Dec 20258.01Pricing of the convertible notes and the registered direct offering
8 Dec 20251.01, 2.03, 3.02$1.15bn 0.25% notes due 2032 and $1.15bn 1.00% notes due 2033, conversion price about $51.40; $201.0m capped calls (cap $82.24); repurchase of $227.7m 2030 and $316.6m 2029 notes
5 Feb 20262.02Q2 FY2026 results: revenue $184.7m; $3.6bn GPU financing secured for Microsoft contract; 1.6GW Oklahoma campus
4 Mar 20261.01, 7.01Dell purchase agreements: about $2.3bn (Canada) and $1.2bn (US) of GPUs for H2 2026 delivery
4 Mar 20268.01New ATM prospectus supplement for up to $6.0bn of ordinary shares; three agents joined
7 May 20262.02Q3 FY2026 results: revenue $144.8m; $3.4bn five year NVIDIA AI cloud contract; NVIDIA right to buy 30m shares at $70
8 May 20262.02Q3 FY2026 results call transcript filed as Ex 99.1
11 May 20268.01Launch of $2bn convertible note offering due 2033
12 May 20268.01Pricing of $2.6bn 1.00% convertible notes due 2033
14 May 20261.01, 2.03, 3.02$3.0bn 1.00% notes due 2033 issued (incl. $400m option), conversion price about $73.07; capped calls $201.3m, cap $110.30
26 May 20261.01, 7.01Dell purchase agreement about $1.6bn of GPUs for the $3.4bn NVIDIA contract at Childress
1 Jun 20261.01, 2.03About $3.6bn GPU financing for the Microsoft contract: $1.5bn DDTL at SOFR + 2.25% and $2.1bn 5.96% notes due 2031
1 Jul 20265.029,099,328 RSUs granted to each Co‑CEO, four year vesting plus two year holding period
20 Jul 20262.02$2.8bn of new customer contracts; 2026 ARR target raised from $3.7bn to more than $4bn, about 85% under contract; cash about $7.6bn at 30 Jun 2026
4 Aug 20267.01, 8.01Resale registration of 11,981,668 shares issued in the Mirantis acquisition (closed 3 Aug 2026)
13 Aug 20267.01Horizon 1 delivered to and accepted by Microsoft; NVIDIA Exemplar Cloud status on GB300 NVL72
27 Aug 20262.02FY2026 results: revenue $707.0m; $4bn contracted ARR for 2026 capacity; $2.8bn of new GPU financings
5 Nov 20262.02Q1 FY2027 results: revenue $228m, AI Cloud $200m; backlog $20.3bn; ARR target moved to Jan 2027
Table 9.2 Material contracts and financing arrangements
ContractTerms
Microsoft Agreement (2 Nov 2025)Dedicated NVIDIA GB300 capacity at Horizon 1 to 4, Childress, 200MW of critical IT load; about $9.7bn through 2031 over a five year average term; 20% of each tranche paid before delivery; Dell GPUs about $5.8bn; Horizon 1 accepted Aug 2026; Horizon 2 to 4 targeted for calendar Q4 2026 with grace periods to the beginning of calendar Q2 2027.
NVIDIA AI cloud contract (May 2026)$3.4bn over five years; air cooled Blackwell GPUs in 60MW at Childress; ramp from early 2027; GPUs from Dell for about $1.6bn. Separate five year NVIDIA right to buy up to 30m shares at $70 (about $2.1bn).
Dell purchase agreementsAbout $5.8bn (Nov 2025, Microsoft GPUs), $2.3bn and $1.2bn (Mar 2026), $1.6bn (May 2026) and about $6.7bn (Sep 2026, delivery from H2 2027).
GPU Financing 1.0 (29 May 2026)About $3.6bn: $1.5bn DDTL at SOFR + 2.25% and $2.1bn 5.96% notes due 31 Dec 2031; secured on the Microsoft GPUs and cash flows; DSCR covenant at least 1.05x; IREN parent guarantees are limited.
GPU Financing 2.0 and 3.0 (Aug 2026)Up to $2.45bn at 9.0% (Blue Owl and PIMCO advised investors, Mackenzie) and $363m at 9.51% (Prince George); IREN guarantees payments.
Convertible notesSix series, $6.75bn principal at 30 Sep 2026, coupons 0% to 3.50%, maturities Dec 2029 to Dec 2033.
AcquisitionsMirantis (closed 3 Aug 2026; $502m of equity consideration in Q1 FY2027) and Nostrum Group (Spain, about 490MW and a pipeline).

10 Ownership, Voting Power & Annual Meeting

  • Co‑CEOs Daniel and William Roberts each hold 3.22% of ordinary shares and one B Class share, giving each 19.76% of voting power; directors and officers hold 39.68% of votes (DEF 14A, 28 Sep 2026). B Class shares must be redeemed by 17 Nov 2033 at the latest.
  • Largest other holders: Goldman Sachs Group 8.31% and Bank of America 5.2% of ordinary shares (DEF 14A).
  • AGM of 19 Nov 2025 (8-K Item 5.07): all proposals passed; 2025 Omnibus Incentive Plan 88.0% of votes cast, say on pay 88.0%, forum selection 96.8%. The 2026 AGM is set for 24 Nov 2026 with a director re election, share repurchase approvals for the prepaid forwards and capped calls, say on pay and auditor items.
  • Insiders: Forms 4 for the last twelve months show award grants only, led by 9,099,328 RSUs to each Co‑CEO on 1 Jul 2026 (four year vesting plus a two year holding period); no open market purchases or sales were reported.
Table 10.1 Annual meeting vote results, 19 Nov 2025
ProposalFor (m votes)Against (m votes)Abstain (m votes)For as % of votes castResult
Quorum aligned with Nasdaq rules245.00.13.7100.0Approved
Director elections at each AGM245.50.23.399.9Approved
Forum selection provision237.37.83.896.8Approved
Advance notice for universal proxies244.90.13.899.9Approved
Miscellaneous constitution changes244.70.33.999.9Approved
2025 Omnibus Incentive Plan214.929.34.788.0Approved
Share repurchase under prepaid forwards223.70.22.899.9Approved
Share repurchase under capped calls223.40.52.899.8Approved
Say on pay (advisory)215.629.43.988.0Approved
Say on pay frequency: every year247.50.40.699.8Every year
2025 AGM, 19 Nov 2025. Broker non votes were not reported in the 8-K table.

Annual meeting remarks

  • No management remarks or shareholder questions from the 19 Nov 2025 meeting were filed; the 8-K reports vote counts only.
Table 10.2 Holders as filed, 28 Sep 2026
HolderOrdinary sharesShare of ordinary shares (%)Voting power (%)
Daniel Roberts (Co‑CEO)13,189,7133.2219.76
William Roberts (Co‑CEO)13,189,7133.2219.76
Directors and officers as a group27,735,1636.6739.68
The Goldman Sachs Group33,642,0548.315.28
Bank of America Corporation21,027,1805.203.27
DEF 14A of 13 Oct 2026. 404,613,536 ordinary shares and 642,842,666 votes; each Co‑CEO holds one B Class share with 15 votes per ordinary share held.

11 Risk Factors

  • Item 1A of the FY2026 10-K holds 100 risk factors against 101 in the FY2025 10-K (53,728 words against 49,966). 23 were added, 24 removed and 30 materially reworded. The Q1 FY2027 10-Q reports no material change.
Table 11.1 Risk factors with filed figures
RiskDisclosure and change
Delivery and acceptanceRevenue starts only after acceptance; the more than $4bn ARR target moved from 31 Dec 2026 to 31 Jan 2027 and may extend to the end of Feb 2027.
Customer concentrationThree customers 70% of Q1 FY2027 revenue (28%, 24%, 18%); Microsoft contract value about $9.7bn; backlog $20.3bn with Microsoft, NVIDIA and 13 other customers.
Capital needs$15bn of remaining planned FY2027 capex, of which $6bn is targeted from new financing subject to market conditions; commitments $18.95bn at 30 Sep 2026.
Debt and guaranteesDebt $9.90bn plus finance leases $311m; IREN guarantees GPU Financing 2.0 and 3.0, equipment leases and the Sep 2026 Dell purchase orders, with limited guarantees on GPU Financing 1.0; finance expense $73m in Q1 FY2027.
DilutionATM sales of $3.7bn by 30 Oct 2026 under a $6.0bn program; $6.75bn of convertible notes; NVIDIA right to buy 30m shares.
Power and Texas rulesERCOT Batch Zero, Texas SB 6 large load rules and the Aug 2026 audit directive; ERCOT mentions in risk factors rose from 23 to 43.
GPU supply and obsolescenceSuppliers incl. NVIDIA, AMD and Dell; Bitcoin miner impairments of $638.8m in FY2026.
ControlEach Co‑CEO holds 19.76% of voting power through one B Class share (39.52% together); directors and officers as a group 39.68%.

How risk factors changed

  • Comparison: 10-K FY2026 filed 27 Aug 2026 acc 0001878848-26-000052 against 10-K FY2025 filed 28 Aug 2025 acc 0001878848-25-000063.
  • Bitcoin is mentioned 163 times in the FY2026 risk factors against 361 a year earlier; the Bitcoin group fell from 22 to 7 factors.
  • A new group of 11 factors covers AI Cloud Services: delivery, acceptance, delay credits, GPU supply, contract and financing matching.
  • GPU is mentioned 41 times against 19, and Microsoft 4 times against none.
  • ERCOT is mentioned 43 times against 23, reflecting Texas large load interconnection rules.
  • Total length rose from 49,966 to 53,728 words while the factor count fell from 101 to 100.
Figure 11.1 Risk factors by change against the prior filing
Table 11.2 Size of the risk factor section
Measure10-K FY202510-K FY2026
Risk factors (count)101100
Words in Item 1A49,96653,728
Table 11.3 Risk factors added, removed and materially reworded
ChangeRisk factorWhat changed
AddedCompetition could hurt market share and resultsNew standalone factor; the FY2025 competition factor was framed around Bitcoin mining and was removed.
AddedAssumptions and projections may not materializeCovers annualized run rate revenue and capex estimates, which IREN now publishes as targets.
AddedIREN acts as its own general contractorData centers are built without a fixed price engineering and construction contract, so cost overruns stay with IREN.
AddedAustralian Bundey site: water, fuel, planning, gridNew factor for the 800MW Bundey, South Australia project.
AddedLabor cost and availability for constructionNew factor; about 3,000 site personnel were engaged in the US at 30 Jun 2026 (Item 1).
AddedConcentration in a limited number of locationsCapacity is concentrated in a limited number of jurisdictions, including Texas within the ERCOT market.
AddedUnable to build or deliver contracted capacityRevenue starts only after delivery, commissioning and customer acceptance.
AddedAcceptance tests, delay credits, termination rightsCustomers may reject capacity, cut commitments or terminate if deadlines or service levels are missed.
AddedGPU supply from few suppliers, obsolescenceNames NVIDIA, AMD, Dell Technologies, Lenovo, Supermicro and Gigabyte as suppliers.
AddedMatching contracts, capex, power and financingMulti billion dollar GPU purchases are made in some cases before customer contracts are signed.
AddedSoftware integration for orchestration and supportLinks to the Mirantis acquisition (closed Aug 2026).
AddedCybersecurity and workload isolation failuresNew factor specific to multi tenant AI cloud workloads.
AddedNon binding strategic relationshipsCovers deployments such as the NVIDIA 5GW partnership that may not become definitive agreements.
AddedAI regulation is evolvingNew factor on AI specific laws affecting customers and services.
AddedConstruction and workplace safetyTwo new factors on site safety incidents and workplace health and safety penalties.
AddedNoise and community oppositionNew factor on community opposition to data center sites.
AddedProperty tax abatements and sales tax exemptionsLoss of tax incentives at US sites could raise costs.
AddedBusiness aviation activitiesIREN operates aircraft for management and customer travel; the factor covers safety and financial exposure.
RemovedFifteen Bitcoin network and custody factorsFactors on proof of stake, forks, halving, 51% attacks, private keys, exchange storage and OTC desks were removed as mining winds down; the Bitcoin group fell from 22 to 7 factors.
RemovedSettlement of equipment financing proceedingsThe factor on the settlement of claims relating to former mining equipment financing was removed.
RemovedCustom mining firmwareRemoved with the mining fleet decommissioning.
RemovedVolatility versus holding Bitcoin directlyRemoved.
RewordedCustomer concentration and counterparty creditRewritten; the top three customers were 28%, 24% and 18% of Q1 FY2027 revenue (10-Q).
RewordedDependence on few equipment suppliersText grew from 631 to 1,057 words and now covers GPU supply and supplier price increases on orders already placed.
RewordedGovernments and utilities may restrict powerGrew from 1,139 to 2,035 words; adds the Texas SB 6 large load rules, ERCOT Batch Zero and the Aug 2026 audit directive of the Texas Governor.
RewordedIndebtedness and liabilitiesGrew from 614 to 1,188 words to cover the GPU financings, convertible notes and parent guarantees.
RewordedTrade policy and tariffsGrew from 801 to 1,134 words; mentions of tariffs rose from 28 to 42.
RewordedCo‑founder control through B Class sharesUpdated; the two Co‑CEOs held 19.76% of voting power each (39.52% together) and directors and officers 39.68% at 28 Sep 2026 (proxy).
Table 11.4 Risk factor updates in quarterly reports since the annual filing
FilingChange disclosed
10-Q Q1 FY2027 filed 5 Nov 2026Part II Item 1A states no material changes to the risk factors in the FY2026 10-K.

12 Stock Price, Scenarios & Sensitivity

  • IREN closed at $18.17 on 13 Nov 2026. The close on 5 Nov 2026, before the release after the market close, was $18.03, the 52 week closing low; the next day it closed at $21.64 (+20.0%). 52 week closing high $67.84 on 27 May 2026. Highest month end close in the period shown $63.54 (May 2026).
  • Valuation basis: EV/Sales. Market value $7.7bn on 424.4m shares (30 Oct 2026); enterprise value $11.8bn adds net debt of $4.12bn (debt carrying amount less cash and restricted cash; finance leases excluded). EV/Sales 17.0x TTM revenue of $694.7m.
  • Scenario method (this report's own assumptions, not company guidance): implied price equals TTM Q1 FY2030 revenue (to Sep 2029) times an exit EV/Sales multiple, less net debt of $4.12bn held at the 30 Sep 2026 level, divided by 551.7m shares (+30% for ATM sales, convertible notes and the NVIDIA right). Base case revenue reaches $6.90bn. Net debt held flat is a simplification: $6bn of remaining FY2027 capex relies on targeted financing.
Figure 12.1 IREN monthly closing price and three year scenarios

Critical factors and core assumptions

Table 12.1 Critical factors behind the best case
FactorCurrent valueBest case requiresEvidence in filings
Delivery of Horizon 2 to 4Horizon 1 accepted Aug 2026; network design change requested by Microsoftall four tranches in service by early 202710-Q MD&A; 8-K Ex 99.1
ARR conversionabout $1bn operating; more than $4bn contractedmore than $4bn operating by Jan to Feb 20278-K Ex 99.1, 5 Nov 2026
Capacity growthabout 93MW operating AI Cloud capacity0.8GW (IT) by end 2027 contracted at $20m or more per MW8-K Ex 99.1, 27 Aug and 5 Nov 2026
Funding$9bn of $15bn remaining FY2027 capex covered by cash, committed GPU financing and prepaymentsprepayments and GPU debt cover the $6bn gap8-K Ex 99.1, 5 Nov 2026
Pricingabout $22m per MW (IT) five year; $40m per MW short termpricing holds as capacity grows8-K Ex 99.1, 5 Nov 2026
Customer mixtop three customers 70% of revenuerevenue spread across contracts with Microsoft, NVIDIA and 13 other customers10-Q Note 4; 8-K Ex 99.1
  • Report assumption, revenue base: TTM Q1 FY2027 $694.7m, still incl. $373.3m of Bitcoin revenue. IREN targets more than $4bn of ARR operational by 31 Jan 2027, possibly end Feb 2027; the growth rates and multiples below are this report's own inputs.
  • Report assumption, best case: 145% revenue CAGR to $10.2bn as 0.8GW (IT) is delivered and contracted near $20m to $22m per MW; exit EV/Sales 5x, against CoreWeave at 7.1x on its 10 Nov 2026 close.
  • Report assumption, base case: 115% revenue CAGR to $6.9bn with later delivery of 2027 capacity; exit EV/Sales 3.5x, against Amazon at 3.3x (late Oct 2026 price).
  • Report assumption, worst case: 75% revenue CAGR to $3.7bn as expansion beyond the 2026 program is delayed or not funded; exit EV/Sales 2.5x.
  • Report assumption, shares up 30% from 424.4m through ATM sales, convertible notes and the NVIDIA right; no dividends or buybacks; net debt held at $4.12bn.

Scenarios, three years forward

Table 12.2 Scenario analysis, TTM Q1 FY2027 to TTM Q1 FY2030
MeasureWorst caseBase caseBest case
Revenue CAGR, 3 years (%)75.0115.0145.0
Revenue, TTM Q1 FY2030 ($bn)3.76.910.2
Exit EV/Sales (x)2.53.55.0
Implied price ($)9.4136.3485.13
Change against $18.17 (%)(48)100369
Implied annual return (%)(19.7)26.067.3
DescriptionExpansion delayed or not funded2026 program plus delayed 2027 capacity0.8GW delivered and contracted
Growth rates, exit multiples and the share count are this report's own assumptions, not company guidance. Implied price = (TTM Q1 FY2030 revenue x exit EV/Sales less net debt $4.12bn) / 551.7m shares. Margins do not enter the EV/Sales calculation. Change is measured against the close of $18.17 on 13 Nov 2026.
Figure 12.2 Three year price scenarios

Sensitivity analysis

Table 12.3 Sensitivity of implied price to revenue CAGR and exit EV/Sales
Revenue CAGR \ EV/Sales2x2.5x3.5x5x6x
75%$6.03$9.41$16.15$26.28$33.03
95%$11.21$15.88$25.21$39.22$48.56
115%$17.56$23.82$36.34$55.11$67.62
130%$23.18$30.84$46.16$69.14$84.46
145%$29.57$38.83$57.35$85.13$103.65
Cells show implied share price in year 3. Close of 13 Nov 2026 $18.17. Blue cells sit above it, red cells below. Report assumptions. EV/Sales basis on TTM Q1 FY2030 revenue; net debt held flat; shares up 30%.

Disclaimer

This analysis is for information only and is not financial advice. It is derived from public SEC filings retrieved via sec-api.io and is not a publication of the U.S. Securities and Exchange Commission. Scenario values are model outputs under stated assumptions and are not forecasts. Data as of 15 November 2026.

Sources

All company and peer figures are read from SEC filings retrieved through the sec-api.io MCP server. Share prices are regular session closes as dated in the text.

Table A.1 Filings used, with accession numbers
FormPeriodFiledAccession number
8-KQ1 FY20275 Nov 20260001878848-26-000065
10-QQ1 FY20275 Nov 20260001878848-26-000066
10-KFY202627 Aug 20260001878848-26-000052
8-KFY202627 Aug 20260001878848-26-000051
10-QQ3 FY20267 May 20260001878848-26-000026
10-QQ2 FY20265 Feb 20260001878848-26-000015
10-KFY202528 Aug 20250001878848-25-000063
8-KQ2 FY20265 Feb 20260001878848-26-000014
8-KQ3 FY20267 May 20260001878848-26-000025
8-KQ3 FY2026 call8 May 20260001878848-26-000028
8-KMicrosoft agreement3 Nov 20250001140361-25-040072
DEF 14A2026 AGM13 Oct 20260001140361-26-039451
Form 4Jul 2026 grants1 Jul 20260000950103-26-009958
8-K24 Nov 20250001140361-25-043142
8-K28 Nov 20250001140361-25-043599
8-K1 Dec 20250001140361-25-043803
8-K3 Dec 20250001140361-25-044095
8-K8 Dec 20250001140361-25-044888
8-K4 Mar 20260001140361-26-007905
8-K4 Mar 20260001140361-26-007919
8-K11 May 20260001140361-26-020370
8-K12 May 20260001140361-26-020669
8-K14 May 20260001140361-26-021285
8-K26 May 20260001878848-26-000030
8-K1 Jun 20260001140361-26-023427
8-K1 Jul 20260001140361-26-027202
8-K20 Jul 20260001140361-26-028871
8-K4 Aug 20260001140361-26-031053
8-K13 Aug 20260001140361-26-032638
Table A.2 Peer and holder filings used
CompanyFormFiledAccession number
Alphabet10-Q Q3 202628 Oct 20260001652044-26-000084
Amazon8-K Ex 99.1 Q3 202629 Oct 20260001018724-26-000038
Applied Digital8-K Ex 99.17 Oct 20260001144879-26-000057
Bank of America (on IREN)13G/A28 Oct 20260000070858-26-000535
Cipher Digital10-Q2 Nov 20260001819989-26-000050
CleanSpark10-Q6 Aug 20260001193125-26-338382
CoreWeave8-K Ex 99.1 Q3 202610 Nov 20260001769628-26-000461
Goldman Sachs (on IREN)13G/A10 Nov 20260000886982-26-000620
MARA10-Q Q3 20269 Nov 20260001507605-26-000028
Microsoft10-Q28 Oct 20260001193125-26-436133
Nebius6-K Ex 99.1 and 99.2 Q3 202612 Nov 20260001104659-26-126008
Oracle10-Q11 Sep 20260001193125-26-389274
Riot Platforms10-Q4 Nov 20260001104659-26-122417
Table B.1 Exhibits to Forms 8-K filed in the last twelve months
FiledExhibitDocumentContent
24 Nov 2025Ex 3.1Amended and restated constitutionApproved at the AGM of 19 Nov 2025: Nasdaq quorum, annual director elections, forum selection, universal proxy notice
28 Nov 2025Ex 16.1Letter of former auditorRaymond Chabot Grant Thornton letter on the change to KPMG LLP; no disagreements reported
1 Dec 2025Ex 99.1, 99.2Convertible note and registered direct offering launchNotes offering and a registered direct share offering to fund repurchase of 2029 and 2030 notes
3 Dec 2025Ex 99.1, 99.2Pricing releasesPricing of the convertible notes and of the registered direct offering
8 Dec 2025Ex 4.1, 4.3, 10.1Indentures for 2032 and 2033 notes; capped call form$1.15bn 0.25% notes due 2032 and $1.15bn 1.00% notes due 2033, conversion price about $51.40; Capped calls cost $201.0m, cap price $82.24; proceeds used to repurchase $227.7m of 2030 notes (about $608.2m) and $316.6m of 2029 notes (about $1.02bn)
5 Feb 2026Ex 99.1Q2 FY2026 results releaseRevenue $184.7m (Bitcoin $167.4m, AI Cloud $17.3m); net loss ($155.4m); adjusted EBITDA $75.3m; $3.6bn GPU financing for the Microsoft contract at under 6%; with the $1.9bn Microsoft prepayment it covers 95% of GPU capex
4 Mar 2026Ex 99.1Dell GPU purchase releaseDell Canada about $2.3bn and Dell USA about $1.2bn of GPUs, delivery in H2 2026
4 Mar 2026Ex 1.1Amended ATM sales agreementUp to $6.0bn of ordinary shares; Citizens JMP, Goldman Sachs and Jefferies joined as agents
7 May 2026Ex 99.1Q3 FY2026 results releaseRevenue $144.8m (Bitcoin $111.2m, AI Cloud $33.6m); net loss ($247.8m) incl. ($140.4m) impairments; adjusted EBITDA $59.5m; $3.4bn five year NVIDIA contract for air cooled Blackwell GPUs in 60MW at Childress; NVIDIA right to buy 30m shares at $70 (up to $2.1bn)
8 May 2026Ex 99.1Q3 FY2026 call transcriptTarget 480MW, 150,000 GPUs and $3.7bn ARR by end 2026; About 50,000 air cooled GPUs uncontracted at the time; cash $2.6bn at 30 Apr 2026
11 May 2026Ex 99.1Convertible offering launch$2bn of notes due 2033 proposed, with a $300m option
12 May 2026Ex 99.1Convertible offering pricing$2.6bn 1.00% notes due 2033 priced, $400m option
14 May 2026Ex 4.1, 10.1, 99.1Indenture for 1.00% notes due 2033; capped call form$3.0bn issued incl. $400m option; net proceeds about $2.96bn; conversion price about $73.07; Capped calls cost $201.3m, cap $110.30 (100% over the $55.15 close of 11 May 2026)
26 May 2026Ex 99.1Dell purchase releaseAbout $1.6bn of GPUs for the $3.4bn NVIDIA managed services contract at Childress
20 Jul 2026Ex 99.1Customer contracts and ARR release$2.8bn of new contracts with AI developers; ARR target raised from $3.7bn to more than $4bn, about 85% under contract; Prepayments about 45% of GPU capex on recent contracts; weighted average contract term about 4 years; cash about $7.6bn at 30 Jun 2026 incl. $1.7bn restricted
4 Aug 2026Ex 5.1, 99.1Mirantis resale registrationResale of up to 11,981,668 shares issued to Mirantis holders; acquisition closed 3 Aug 2026
13 Aug 2026Ex 99.1Horizon 1 delivery releaseHorizon 1 delivered to and accepted by Microsoft; NVIDIA Exemplar Cloud status for GB300 NVL72
27 Aug 2026Ex 99.1FY2026 results releaseFY2026 revenue $707.0m (AI Cloud $128.8m, Bitcoin $578.2m); net loss ($702.6m) incl. ($638.8m) impairments; adjusted EBITDA $245.7m; $4bn contracted ARR for 2026 capacity, $1bn operating; 3 year contracts above $20m per MW (IT), about 2 year payback
5 Nov 2026Ex 99.1Q1 FY2027 results releaseRevenue $228m (+66% on Q4 FY2026); AI Cloud $200m (+182%); net loss ($263m); adjusted EBITDA $66m; Backlog $20.3bn (+22%), about two thirds investment grade; more than $4bn ARR target moved to Jan 2027