Revenue Q3 2026
$269m
+413.7% year on year (Q3 2025 $52m)
Operating expenses Q3 2026
$304m
+347.4% year on year (Q3 2025 $68m)
Operating margin Q3 2026
(12.7%)
+16.7 pts year on year (Q3 2025 (29.4%))
Key findings
  • Revenue $269.3m in Q3 2026, +413.7% year on year and +30.6% on Q2; costs +347.4%. Lanteris, bought on 13 Jan 2026, added $215.1m; revenue from the legacy lunar, network and engineering contracts was $54.2m against $52.4m. Gross margin before depreciation 25.7% (10.8% in Q3 2025); operating loss $34.2m, an operating margin of (12.7%) against (29.4%).
  • Backlog $1.87bn at 30 Sep 2026 against $235.9m a year earlier and $213.1m at 31 Dec 2025: $612.8m acquired with Lanteris, $31.7m with Goonhilly and $1.77bn of new awards, less $662.2m recognized and $94.7m of adjustments, mainly descoping. 13% to 15% is expected in the rest of 2026 and 40% to 45% in 2027 (10-Q). RPO, the accounting measure, was $1.00bn.
  • Customer mix moved to national security and commercial: national security $69.4m (25.8% of revenue against 5.6%), commercial $96.7m (35.9% against 12.4%), civil $103.1m (38.3% against 79.2%). Three customers were 36%, 25% and 15% of Q3 revenue (10-Q).
  • Lunar delivery: four open NASA CLPS missions (IM‑3 to IM‑6) with $444.5m of estimated fixed price revenue plus a $79.7m IM‑5 option; IM‑3 and IM‑4 are in a loss position, with 9M 2026 contract losses of $9.1m and $17.6m. Selected for CLPS 2 in Oct 2026 ($10bn ceiling across vendors; 10-Q). IM‑3 and Altus‑1 are planned for Mar/Apr 2027.
  • Cash $463.8m at 30 Sep 2026 against $582.6m at 31 Dec 2025, after $449.3m of Lanteris cash consideration, $175m of placement proceeds and $331.8m net from the at the market program; $345m convertible notes due 2030. Q3 free cash flow $33.5m (operating cash flow $66.2m, capex $32.7m); 9M 2026 ($112.3m).
  • FY2026 revenue guidance narrowed to $920m to $950m from $900m to $1bn (implied Q4 $257.8m to $287.8m); adjusted EBITDA guided positive, 9M 2026 ($3.0m). Shares closed at $13.03 on 12 Nov 2026; EV/Sales 4.1x TTM. Scenario prices three years forward on exit EV/Sales: base $14.13, best $27.84, worst $5.30.

Figures are read from the Q3 2026 earnings release (8-K Ex 99.1 of 12 Nov 2026), the Q3 2026 10-Q filed on 12 Nov 2026, the Forms 10-Q for Q1 and Q2 2026, the FY2025, FY2024 and FY2023 Forms 10-K, the Forms 8-K with all their exhibits, incl. the earnings releases for Q1 2025 to Q3 2026 with the guidance they contain, the Lanteris and Goonhilly acquisition releases, the 8-K/A with the audited Lanteris statements and pro forma figures, the $175m placement and at the market agreements, the 2026 proxy statement, the Item 5.07 vote results, Forms 3 and 4 for central index key 1844452, and the filings of Rocket Lab, Firefly Aerospace, AST SpaceMobile and Redwire. Intuitive Machines files no separate CFO commentary; CFO and management points come from the releases and the 10-Q MD&A. Share price $13.03 is the regular session close of 12 Nov 2026, the day of the release. Accession numbers appear in the Sources appendix.

1 Revenue & Business Model

  • Storyline: Intuitive Machines bought Lanteris, a satellite manufacturer with FY2025 revenue of $601m against its own $210.1m, in Jan 2026, so Q3 2026 revenue of $269.3m is 5.1x the Q3 2025 level while the lunar business it was known for is a minority of revenue. Chapters 2 to 4 cover the three revenue drivers: spacecraft production (Lanteris), lunar delivery (NASA CLPS and CLPS 2) and the space data network (Near Space Network, Goonhilly).
  • Intuitive Machines reports one segment and groups its work as build (spacecraft, landers, satellites), connect (communications and data relay networks) and operate (mission operations and data services) (10-Q). Revenue is product revenue (Lanteris spacecraft), service revenue (lunar missions, NASA networks and engineering) and grant revenue.
  • Revenue FY2022 $85.9m, FY2023 $79.6m, FY2024 $228.0m, FY2025 $210.1m ((7.9%)); TTM Q3 2026 $707.0m. Lanteris revenue was $601m in FY2025 and $722m in FY2024 on its own audited statements; pro forma combined FY2025 revenue was $811.1m (8-K/A, 1 Apr 2026).
  • Lanteris deal: consideration $853.3m: $405.6m cash, $43.7m of transaction bonuses and 22,991,028 Class A shares valued at $404.0m at $17.57. Goodwill rose to $406.7m and intangibles to $274.9m at 30 Sep 2026 from $18.7m and $13.0m.
  • Geography: 0.9% of Q3 2026 revenue came from outside the US, against 10.3% in Q3 2025 (10-Q).
Figure 1.1 Revenue and operating margin, FY2022 to TTM Q3 2026
Table 1.1 Revenue, margins, cash flow and backlog, last seven quarters
LineQ1 2025Q2 2025Q3 2025Q4 2025Q1 2026Q2 2026Q3 2026
Revenue ($m)62.550.352.444.8186.7206.2269.3
Product revenue, Lanteris ($m)0.00.00.00.0141.6166.7215.1
Service revenue ($m)62.550.351.043.342.136.754.1
Gross margin excl. D&A (%)10.7(23.5)10.819.016.117.425.7
Operating income ($m)(10.1)(28.6)(15.4)(33.1)(39.2)(47.1)(34.2)
Adjusted EBITDA ($m)(6.6)(25.4)(13.2)(19.1)2.7(13.8)8.3
Net income (loss) ($m)1.0(38.2)(10.0)(59.7)(52.5)(62.8)(3.4)
Free cash flow ($m)13.3(27.3)(19.0)(22.9)(64.6)(83.9)33.5
Backlog ($m)2722572362131,0551,7621,867
Q4 2025 flows equal FY2025 less 9M 2025. Q1 2026 operating cash flow as filed in the Q1 2026 10-Q; Q2 2026 as filed in the Q2 2026 release; Q3 2026 equals 9M less H1 as filed. Lanteris consolidated from 13 Jan 2026. Adjusted EBITDA as filed in each release; Q1 and Q2 2026 were recast in Q3 2026 to a combined ($11.2m) against ($11.1m) as first filed.

2 Spacecraft Production: Lanteris Added $523.4m of 9M Revenue and a Golden Dome Order

  • Product revenue, all from Lanteris: $141.6m in Q1, $166.7m in Q2 and $215.1m in Q3 2026 (Q1 excludes the first 12 days of Jan, about $13m). 9M 2026: commercial satellites $220.6m, national security $172.9m, civil $130.0m (10-Q).
  • Margin before depreciation by market, Q3 2026: commercial satellites 19.7%, national security 20.4%, civil 55.6%; Lanteris in total 29.1% against a company gross margin of 25.7%.
  • Awards in 2026: three commercial GEO satellites (above $600m, Q2), SDA Tranche 3 tracking layer (Q1), 18 AMDT3 platforms for L3Harris (Aug), EAGLE VSWIR for NASA JPL (Aug), two IM 300 platforms for Hartford (Sep) and JPL FALCON RADAR (Nov); a Space Force Andromeda IDIQ award ($6.2bn anticipated ceiling, Q1 2026 release). The FY2025 release lists an MDA SHIELD IDIQ award ($151bn ceiling).
  • Before the deal Lanteris revenue fell to $601m in FY2025 from $722m, with a $2m operating loss after a $35m impairment (audited statements, 8-K/A); TTM product revenue to Q3 2026 is $523.4m for 8.5 months of ownership.

How spacecraft demand is changing

  • National security constellations: Rocket Lab won $816m for 18 SDA Tracking Layer Tranche 3 satellites in Dec 2025 (Rocket Lab filings); Intuitive Machines reports a Tranche 3 tracking layer award (Q1 2026 release) and supplies 18 platforms to L3Harris for AMDT3 (10-Q).
  • Customer mix: national security revenue rose to $69.4m in Q3 2026 from $2.9m, commercial to $96.7m from $6.5m (10-Q disaggregation).
  • Peers: Rocket Lab Space Systems revenue $214.8m (+88.1%) with a 33.2% segment gross margin; Redwire Space $61.3m (+31.6%); Firefly total revenue $110.7m (+259.6%) in Q3 2026.
Figure 2.1 Revenue by customer type by quarter
Figure 2.2 Lanteris revenue and cost by market
Table 2.1 Spacecraft builders compared, Q3 2026
Company and linePeriodRevenueGrowth (%)Margin (%)Detail
Intuitive Machines (Lanteris product revenue)Q3 2026$215.1mn/a29.1margin before D&A; first owned quarter Q1 2026
Rocket Lab Space SystemsQ3 2026$214.8m88.133.2segment gross margin; Space Systems backlog $1.72bn
Redwire Space segmentQ3 2026$61.3m31.6n/aSpace backlog $379.6m
Firefly Aerospace totalQ3 2026$110.7m259.622.9company gross margin; backlog about $1.7bn
AST SpaceMobile totalQ3 2026$42.3m187.1n/abuilds its own BlueBird satellites
Rocket Lab segment gross margin; Firefly company gross margin; Intuitive Machines Lanteris margin before depreciation. Growth n/a where the business was not owned a year earlier or not disclosed.

3 Lunar Delivery: Four CLPS Missions, CLPS 2 and Contract Losses

  • Open CLPS missions (10-Q Q3 2026): IM‑3 $91.3m (94% complete, to Mar 2027), IM‑4 $124.5m (53%, to Aug 2028), IM‑6 $160.1m (awarded Mar 2026, the first on the larger Nova‑D lander, to May 2031) and IM‑5 $68.6m base plus a $79.7m option and up to $15.0m incentive (Jun 2026, to Aug 2027). Constrained success based revenue: IM‑3 $9.7m, IM‑4 $16.2m, IM‑6 $18.3m.
  • Contract losses: IM‑3 and IM‑4 are in a loss position; 9M 2026 losses $9.1m and $17.6m; a rideshare contract tied to IM‑4 was partly descoped (10-Q). Q3 CLPS revenue rose $1.1m, 9M fell $12.3m.
  • CLPS 2 (Oct 2026): a multiple award IDIQ with a 10 year base, a $10bn ceiling across all vendors and a five year $5bn option; it adds direct lander acquisition and funded technology development. Task orders under it are excluded from backlog until awarded.
  • Lunar Terrain Vehicle: the LTV feasibility contract was completed in Q2 2025, so 9M 2026 LTV revenue fell $12.8m (10-Q); the Q1 2026 release (14 May 2026) reported an LTV proposal awaiting an award decision.

How lunar demand is changing

  • NASA moved to larger programs: CLPS 2 widens CLPS to lander purchases and technology development under a $10bn ceiling plus a $5bn option (10-Q).
  • Firefly: first lunar landing in Mar 2025 and four further Blue Ghost missions under NASA CLPS task orders, planned through 2029 (Firefly 10-Q Q3 2026).
Figure 3.1 CLPS mission contract values
Figure 3.2 Product and service revenue by quarter
Table 3.1 Lunar contracts compared
CompanyContractValueStatus
Intuitive MachinesIM‑3 to IM‑6 open; CLPS 2 vendor$444.5m estimated plus $79.7m optiontwo landings (2024, 2025); IM‑3 Mar/Apr 2027
Firefly Aerospacefour further CLPS task ordersn/afirst Blue Ghost landing Mar 2025; missions planned through 2029
Intuitive Machines values are estimated fixed price revenue excl. constrained amounts (10-Q Q3 2026); Firefly from its 10-Q Q3 2026.

4 Space Data Network: Near Space Network, Goonhilly and the Altus Constellation

  • Near Space Network Services: NASA lunar data relay contract; Altus‑1, the first relay satellite, is planned with IM‑3 in Mar/Apr 2027 and Altus 2 to 5 are planned to deploy together in 2028 on a NASA provided launch vehicle (release). 9M 2026 NSN revenue fell $8.9m on schedule delays and a lower estimate at completion; long lead material for satellites two to five was bought in Q2 2026.
  • Goonhilly and COMSAT (3 Aug 2026): $32.2m consideration ($20.4m cash, 960,649 shares at $12.21); 44 antennas over two continents incl. 32 metre and 30 metre deep space dishes; $2.5m of revenue and a $1.6m operating loss to 30 Sep 2026; $31.7m of acquired backlog.
  • Backlog $1.87bn against RPO $1.00bn: the gap of $862.5m is $586.8m on the three satellite commercial program, $226.8m of funded value on contracts billed as performed and $48.9m of constrained revenue (10-Q).
  • Data services in revenue: NASA LROC and ShadowCam lunar imaging operations awards (Q2 2026) and NSN sit in service revenue; the company does not report data services revenue separately.

How space data demand is changing

  • Lunar relay: the Altus constellation serves NSN lunar data relay (release); Firefly describes its Elytra spacecraft for long range communications relay (Firefly 10-Q Q3 2026).
  • Ground networks: Goonhilly adds deep space antennas in the UK and COMSAT more than 90 hosted and leased antennas (8-K Ex 99.1, Aug 2026); the 10-Q adds a risk factor on UK operations.
  • Funding: the $175m placement of Feb 2026 was earmarked for NSN, the Lanteris 1300 series platform and in space data processing (8-K Ex 99.1).
Figure 4.1 Backlog by quarter
Figure 4.2 RPO to backlog bridge
Table 4.1 Backlog and revenue, last five quarters
LineQ3 2025Q4 2025Q1 2026Q2 2026Q3 2026
Backlog at quarter end$235.9m$213.1m$1.06bn$1.76bn$1.87bn
Revenue in quarter$52.4m$44.8m$186.7m$206.2m$269.3m
Backlog to quarterly revenue (x)4.54.85.78.56.9
Backlog from the 8-K Ex 99.1 releases; policy reassessed after the Lanteris acquisition (10-Q).

5 Financial Analysis & Ratios

  • GAAP operating margin TTM (21.7%) against (41.5%) in FY2025 and (25.2%) in FY2024. Adjusted EBITDA TTM ($22.1m); depreciation and amortization TTM $42.6m after acquired intangibles.
  • Net loss TTM $178.4m incl. fair value changes of warrant liabilities; Q3 2026 net loss $3.4m includes a $30.0m warrant gain. FY2024 net loss $346.9m included $120.1m of earn out and $77.7m of warrant fair value losses and a $93.1m loss on issuance of securities.
  • Free cash flow TTM ($135.3m): operating cash flow ($53.0m) less capex $82.3m; Q3 was the only 2026 quarter with positive free cash flow ($33.5m). Contract liabilities rose $74.1m in Q3 and other liabilities $98.7m, while contract assets rose $69.0m and other assets $78.9m (10-Q cash flow statement).
  • Balance sheet at 30 Sep 2026: cash $463.8m, restricted cash $13.2m; convertible notes $336.9m carrying value ($345m principal, conversion price about $13.11); orbital receivables $208.2m non current; pension liability $43.0m; redeemable noncontrolling interest $783.7m in mezzanine equity; shareholders' equity $235.8m against ($754.4m) at 31 Dec 2025.
  • Capital returns: no dividends; $20.7m of Class A shares repurchased in FY2025. Equity raised in 2026: $175m at $15.12 (Feb) and $331.8m net through the at the market program (Q2 and Q3).
Table 5.1 Income statement, cash flow and balance sheet summary ($m unless stated)
Line itemFY2022FY2023FY2024FY2025TTM Q3 2026
Revenue85.979.6228.0210.1707.0
Gross profit10.4(24.4)2.89.0143.8
Selling, general and administrative14.934.353.392.6254.9
Operating income(5.5)(61.1)(57.4)(87.2)(153.7)
Net income(6.4)10.1(346.9)(106.8)(178.4)
Diluted EPS ($)n/a2.42(4.63)(0.73)n/a
Operating cash flow0.8(45.3)(57.6)(14.3)(53.0)
Capital expenditure(16.4)(29.9)(10.1)(41.6)(82.3)
Free cash flow(15.6)(75.2)(67.7)(56.0)(135.3)
Stock based compensation0.64.38.88.631.8
Cash and investments25.84.5207.6582.6463.8
Total debt20.08.00.0335.3336.9
Total equityn/a(261.4)(1,008.0)(754.4)235.8
Gross profit is revenue less cost of revenue excluding depreciation and amortization, as filed. G&A includes R&D before 2026 as filed in the Forms 10-K. Net income is consolidated net income (loss) incl. noncontrolling interests. FY2023 as restated in the FY2024 10-K. TTM equals Q4 2025 plus Q1 to Q3 2026; balance sheet at 30 Sep 2026.
Figure 5.1 Quarterly revenue and margins
Table 5.2 What changed, Q3 2026 against Q3 2025
MetricQ3 2025Q3 2026Change
Revenue ($m)52.4269.3413.7%
Gross profit ($m)5.769.31,122.7%
Operating income ($m)(15.4)(34.2)(122.1%)
Net income ($m)(10.0)(3.4)66.3%
Diluted EPS ($)(0.06)(0.02)66.7%
Operating cash flow ($m)(7.2)66.2n/a
Free cash flow ($m)(19.0)33.5n/a
Operating margin (%)(29.4)(12.7)16.7 pts
Net margin (%)(19.0)(1.2)17.7 pts
Table 5.3 Ratio analysis
RatioFY2022FY2023FY2024FY2025TTM Q3 2026
Growth and margins
Revenue growth (%)n/a(7.4)186.6(7.9)n/a
Gross margin (%)12.1(30.7)1.24.320.3
Operating margin (%)(6.4)(76.8)(25.2)(41.5)(21.7)
Net margin (%)(7.5)12.7(152.2)(50.9)(25.2)
FCF margin (%)(18.2)(94.5)(29.7)(26.6)(19.1)
Cost and investment intensity
SBC (%) revenue0.75.43.94.14.5
Capex (%) revenue19.137.64.419.811.6
Returns
Asset turnover (x)1.280.930.640.280.32
Liquidity and leverage
Current ratio (x)0.430.392.974.961.48
Debt to equity (x)n/an/an/an/a1.43
Net cash ($bn)0.00.00.20.20.1
Efficiency and cash quality
Days sales outstanding677722159
Gross margin excludes depreciation and amortization. Equity is negative before 2026 because redeemable noncontrolling interest sits in mezzanine equity, so return ratios are not shown.
Figure 5.2 Margin profile
Figure 5.3 Operating cash flow, capital expenditure and free cash flow
Table 5.4 Valuation snapshot at $13.03 per share, 12 Nov 2026
MeasureValue
Market cap ($bn)3.0
Enterprise value ($bn)2.9
EV/Sales (TTM) (x)4.1
FCF yield (%)(4.5)
Price/Book (x)12.8

Cost structure and profitability

  • Costs (revenue less operating income) $303.6m in Q3 2026, +347.4%, against revenue +413.7%; operating margin 16.7 pts year on year and 10.1 pts on Q2 2026.
  • Cost of revenue excl. D&A 74.3% of revenue against 89.2% a year earlier; Lanteris product costs were $152.6m (commercial satellites $74.6m, national security $53.8m, civil $24.2m).
  • Depreciation and amortization $13.2m against $0.8m, mainly amortization of Lanteris intangibles; G&A incl. R&D 33.6% of revenue against 38.7%.
  • Share based compensation $10.6m (3.9% of revenue) against $1.4m.
Figure 5.4 Costs as % of revenue by quarter
Figure 5.5 GAAP operating income and adjusted EBITDA by quarter
Figure 5.6 Cash flow by quarter
Table 5.5 Costs as % of revenue, last five quarters
LineQ3 2025Q4 2025Q1 2026Q2 2026Q3 2026
Cost of revenue excl. D&A (% of revenue)89.281.083.982.674.3
Depreciation and amortization (% of revenue)1.63.17.07.24.9
G&A incl. R&D (% of revenue)38.789.730.133.033.6
Share based compensation (incl. above) (% of revenue)2.74.14.75.13.9
Operating income (loss) (% of revenue)(29.4)(73.9)(21.0)(22.9)(12.7)
Table 5.6 Operating income to net loss and adjusted EBITDA ($m)
LineQ3 2025Q3 20269M 2026
Revenue52.4269.3662.2
Gross profit excl. D&A5.769.3135.3
Operating income (loss)(15.4)(34.2)(120.6)
Interest income less expense3.5(1.6)(8.0)
Warrant fair value change2.030.09.0
Net income (loss)(10.0)(3.4)(118.7)
Adjusted EBITDA(13.2)8.3(3.0)
Adjusted EBITDA 9M 2026 as recast in the Q3 2026 release. Warrant liabilities relate to the bridge loan conversion warrants.

6 MD&A & Management Commentary

Q3 2026 results: 8-K Ex 99.1 and 10-Q of 12 Nov 2026

  • Revenue $269.3m, +413.7% year on year and $63.2m above Q2 2026; 9M 2026 $662.2m. Lanteris contributed $215.1m: commercial satellites $92.9m, national security $67.6m and civil $54.5m (10-Q).
  • CLPS revenue rose $1.1m in Q3: IM‑5 added $12.9m and IM‑6 $0.4m, while IM‑4 fell $5.1m on higher estimated costs to meet payload customer obligations, IM‑3 fell $1.5m and IM‑2, completed in 2025, $5.5m (10-Q). In 9M 2026 CLPS revenue fell $12.3m, LTV revenue $12.8m and NSN revenue $8.9m on schedule delays and a lower estimate at completion.
  • Profit lines: gross margin $69.3m (25.7%), lifted by the satellite business, volume and net favorable one time program adjustments (release); operating loss $34.2m against $15.4m; adjusted EBITDA $8.3m against ($13.2m); net loss $3.4m against $10.0m.
  • G&A excl. depreciation $82.9m, up $66.6m: compensation +$20.8m, professional fees +$18.8m, credit loss expense +$9.5m and share based compensation +$9.2m; transaction and integration costs were $9.6m and non recurring legal expense $10.3m, both excluded from adjusted EBITDA.
  • Cash: operating cash flow $66.2m in Q3 against ($111.9m) in H1 2026; capex $32.7m; acquisitions $17.8m; at the market proceeds $98.1m gross in Q3.
  • Awards in Q3 and Q4 to date (10-Q): 18 spacecraft platforms for L3Harris under AMDT3 (Golden Dome), NASA JPL EAGLE VSWIR on the IM 300 platform (launch 2028), two IM 300 platforms for Hartford (national security), CLPS 2 (Oct 2026) and JPL FALCON RADAR (Nov 2026).
Table 6.1 Guidance as filed in the 8-K Ex 99.1 releases of 2026
ItemOutlookSource
FY2026 revenue$920m to $950m, narrowed from $900m to $1bn8-K Ex 99.1, 12 Nov 2026
Implied Q4 2026 revenue$257.8m to $287.8m, derived as FY guidance less 9M revenue of $662.2mderived
FY2026 adjusted EBITDApositive; 9M 2026 ($3.0m), Q3 2026 $8.3m8-K Ex 99.1, 12 Nov 2026
FY2026 revenue, first outlook$900m to $1bn, held in May and Aug 20268-K Ex 99.1, 19 Mar, 14 May and 13 Aug 2026
Backlog conversion13% to 15% of $1.87bn in the rest of 2026; 40% to 45% in 202710-Q Q3 2026
IM‑3 and Altus‑1 launchMar/Apr 2027 timeframe8-K Ex 99.1, 12 Nov 2026
Altus 2 to 5 data relay satellitesdeploy together in 2028 on a NASA provided launch vehicle8-K Ex 99.1, 12 Nov 2026

Management and CFO commentary

  • Intuitive Machines files no CFO commentary document; the points below come from the earnings releases and the 10-Q MD&A.
  • Q3 2026 release (12 Nov 2026), CEO Steve Altemus: Q3 described as record performance across revenue, profitability, cash flow and backlog; focus on IM‑3 and the first Altus‑1 lunar satellite for a Mar/Apr 2027 launch and on converting backlog through repeatable production.
  • Q3 2026 release, financial highlights: gross margin $69m (26%) from the satellite business, higher volume and net favorable one time program adjustments; $450m of new awards and Goonhilly backlog in Q3.
  • 10-Q MD&A (CFO Peter McGrath signs): backlog policy reassessed after Lanteris; adjusted EBITDA no longer adds back other income from Q3 2026; management expects cash and equity raised to fund operations for at least twelve months.
  • Q2 2026 release (13 Aug 2026): $920m of Q2 awards, the $600m+ three satellite GEO contract, national security 30% of Q2 revenue; inventory and long lead purchases for Altus 2 to 5.
  • Q1 2026 release (14 May 2026): Lanteris described as immediately accretive; positive adjusted EBITDA of $2.7m.
Table 6.2 Management statements in their own words
SpeakerDate and sourceStatement
Steve Altemus, CEO14 May 2026, 8-K Ex 99.1“Our acquisition of Lanteris has been immediately accretive”
Steve Altemus, CEO14 May 2026, 8-K Ex 99.1“Intuitive Machines continues to execute, grow, and win new business at record pace.”
Table 6.3 Key disclosures in the FY2025 10-K and the Q3 2026 10-Q
ItemDisclosure
10-Q Q3 2026, revenueProduct revenue $215.1m (Lanteris); service revenue $54.1m; fixed price contracts 87% of Q3 revenue against 58%, cost reimbursable 12% against 36%.
10-Q Q3 2026, customersThree customers 36%, 25% and 15% of Q3 revenue (one customer 72% in Q3 2025); three customers 36%, 29% and 17% of orbital receivables.
10-Q Q3 2026, backlog and RPOBacklog $1.87bn against RPO $1.00bn; the $862.5m difference is $586.8m on the three satellite commercial program, $226.8m of funded value billed as performed and $48.9m of constrained revenue.
10-Q Q3 2026, contract lossesIM‑3 (94% complete) and IM‑4 (53% complete) in a loss position; current loss provisions $2.9m and $8.3m; 9M 2026 losses $9.1m and $17.6m.
10-Q Q3 2026, legalThe US Department of Justice served a Civil Investigative Demand on 27 Oct 2026 in a False Claims Act investigation; a separate DOJ investigation of Lanteris cybersecurity compliance from Oct 2023 is indemnified by the seller parent Vantor; legal accruals $13.1m against $2.1m.
10-Q Q3 2026, liquidityCash $463.8m and working capital $273.3m; ING orbital receivables facility up to $250m to 1 Dec 2026; non cancelable purchase obligations $41.5m.
10-K FY2025, debt$345m 2.500% convertible senior notes due 1 Oct 2030 issued Aug 2025, conversion rate 76.2631 shares per $1,000; capped calls bought for $36.8m; no other borrowings at 31 Dec 2025.
10-K FY2025, structureUp C structure: Intuitive Machines, Inc. holds Intuitive Machines, LLC; 23.7% of the LLC net loss is allocated to noncontrolling interest at 30 Sep 2026; Tax Receivable Agreement with LLC unitholders.

7 Peer Valuation & Sector Summary

  • Sector: space infrastructure across spacecraft manufacturing, launch, lunar delivery and space data. Rocket Lab and Redwire build spacecraft and components, Firefly holds CLPS lunar landers and launch, AST SpaceMobile builds its own satellites for a constellation it operates.
  • Growth, Q3 2026 year on year: LUNR +413.7%, FLY +259.6%, ASTS +187.1%, RKLB +72.7%, RDW +5.4%. LUNR includes Lanteris from 13 Jan 2026.
  • Operating margin, Q3 2026: LUNR (12.7%), RDW (24.1%), RKLB (29.6%), FLY (91.8%), ASTS (398.6%).
  • Backlog at 30 Sep 2026: RKLB $3.57bn, LUNR $1.87bn, FLY about $1.7bn, ASTS about $1.3bn of contracted revenue commitments, RDW $0.62bn. Backlog to TTM revenue: LUNR 2.6x, RKLB 4.1x, FLY 4.6x, RDW 1.4x.
  • Valuation, EV/Sales TTM at 12 Nov 2026: RKLB 44.1x, ASTS 100.7x, FLY 10.5x, LUNR 4.1x, RDW 3.6x.
Table 7.1 Peer comparison: Q3 2026 growth and margin, TTM revenue, prices of 12 Nov 2026
CompanyRevenue TTM ($bn)Revenue growth (%)Operating margin (%)Net cash ($bn)Market value ($bn)EV/Sales (x)
LUNR0.7413.7(12.7)0.134.1
RKLB0.972.7(29.6)4.74444.1
FLY0.4259.6(91.8)0.5410.5
ASTS0.1187.1(398.6)(0.9)13100.7
RDW0.45.4(24.1)0.423.6
Revenue growth and operating margin are Q3 2026 against Q3 2025 from each company's 10-Q or 8-K Ex 99.1; revenue is TTM to Q3 2026 (Firefly: 9M 2026 plus Q4 2025). Net cash: cash less debt principal (Rocket Lab and Redwire incl. marketable securities or restricted cash; AST SpaceMobile incl. restricted cash). Market values at the 12 Nov 2026 close on cover page share counts. AST SpaceMobile is left out of the scatter chart (Q3 operating margin below (300%)).
Figure 7.1 Revenue growth versus operating margin, peer set

8 Material Events & Contracts

  • 14 Forms 8-K and 8-K/A from 4 Nov 2025 to 12 Nov 2026: five earnings releases, the Lanteris agreement, closing and audited statements, the Goonhilly agreement and closing, the $175m placement, the at the market agreement, compensation and board changes, and the annual meeting results.
  • Acquisitions: Lanteris for $853.3m in total consideration (13 Jan 2026), Goonhilly and COMSAT for $32.2m (3 Aug 2026; Goonhilly contributed $2.5m of revenue and a $1.6m operating loss to 30 Sep 2026), and KinetX in Q3 2025.
Table 8.1 Forms 8-K filed in the last twelve months
DateItemsEvent
4 Nov 20251.01, 2.02, 3.02, 7.01, 9.01Agreement to buy Lanteris Space Systems (formerly Maxar Space Systems) from Advent for $800m ($450m cash, $350m shares); Q3 2025 revenue $52.4m, backlog $235.9m, cash $622.0m
13 Jan 20261.01, 2.01, 2.03, 3.02, 7.01, 9.01Lanteris acquisition completed; guarantee of the ING orbital receivables purchase facility (up to $250m, to 1 Dec 2026)
11 Feb 20265.02Cash transaction bonuses of $512,750 to CEO Stephen Altemus and $247,500 to CFO Peter McGrath for the KinetX and Lanteris acquisitions
25 Feb 20261.01, 3.02, 7.01, 9.01Securities purchase agreement: 11,574,069 Class A shares at $15.12 for $175m, led by global institutional investors
27 Feb 20261.01, 9.01$175m placement closed; registration rights agreement
19 Mar 20262.02, 9.01Q4 2025 results: revenue $44.8m, FY2025 $210.1m; FY2026 outlook revenue $900m to $1bn, adjusted EBITDA positive
1 Apr 20269.01 (8-K/A)Lanteris audited FY2025 statements (revenue $601m, FY2024 $722m) and pro forma combined FY2025 revenue $811.1m
14 May 20262.02, 9.01Q1 2026 results: revenue $186.7m, adjusted EBITDA $2.7m, backlog $1.06bn; agreement to buy Goonhilly Earth Station and COMSAT (Ex 99.2)
3 Jun 20261.01, 9.01At the market sales agreement for up to $500m of Class A shares with ten agents, commission up to 3.0%
8 Jun 20265.07Annual meeting of 4 Jun 2026: Ghaffarian and Altemus re elected; Grant Thornton ratified
3 Aug 20261.01, 7.01, 8.01, 9.01Goonhilly and COMSAT acquisition completed; COMSAT bought for a $10m base cash price
13 Aug 20262.02, 9.01Q2 2026 results: revenue $206.2m, backlog $1.76bn, $920m of Q2 awards; outlook unchanged at $900m to $1bn
22 Oct 20265.02, 9.01Michael Blitzer resigned from the board; Dr. Christopher Scolese, NRO Director 2019 to 2026, appointed
12 Nov 20262.02, 9.01Q3 2026 results: revenue $269.3m, gross margin 26%, positive free cash flow $33m, backlog $1.87bn; FY2026 revenue outlook narrowed to $920m to $950m
Table 8.2 Material contracts and financing arrangements
ContractTerms
NASA CLPS task ordersIM‑3 $91.3m, IM‑4 $124.5m, IM‑6 $160.1m (estimated fixed price revenue excl. constrained amounts); IM‑5 $68.6m base, $79.7m option, up to $15.0m incentive (10-Q Q3 2026).
CLPS 2Multiple award IDIQ, 10 year base, $10bn combined ceiling plus a five year $5bn option; selected Oct 2026; covers payload delivery, lander acquisition and technology development.
Near Space Network ServicesNASA lunar data relay contract; Altus 1 planned with IM 3 in Mar/Apr 2027, Altus 2 to 5 in 2028; 9M 2026 NSN revenue down $8.9m on schedule delays.
Three satellite commercial programContract above $600m for three commercial GEO satellites (Q2 2026); $45.0m authority to proceed; $586.8m of backlog not yet in RPO.
AMDT3 (L3Harris)18 spacecraft platforms for the Space Development Agency Accelerated Missile Defense Tranche 3, a Golden Dome program (Aug 2026).
Lanteris purchase$853.3m: $405.6m cash, $43.7m transaction bonuses and 22,991,028 Class A shares; acquired backlog $612.8m.
Convertible notes$345m 2.500% due 1 Oct 2030; conversion price about $13.11; capped calls bought for $36.8m; fair value $508.2m at 30 Sep 2026.
At the market programUp to $500m of Class A shares (Jun 2026), commission up to 3.0%; $331.8m net raised in Q2 and Q3 2026.
Orbital receivables purchase facilityING may buy Lanteris orbital receivables up to $250m through 1 Dec 2026, with make whole payments on customer prepayment.

9 Ownership, Voting Power & Annual Meeting

  • Two share classes vote together: Class A with 1 vote and Class C with 3 votes; Class C is held by the founders and pairs with Intuitive Machines LLC units. Dr. Kamal Ghaffarian holds 33.5% of votes, Stephen Altemus 11.6% and Dr. Timothy Crain 8.2%; directors and officers 54.1% (2026 proxy, 10 Apr 2026).
  • Largest outside holders at 10 Apr 2026: Advent 14.4% of Class A from the Lanteris consideration, BlackRock 5.9%. Advent sold 11,495,514 shares at $12.84 on 28 Jul 2026 (Form 4); State Street filed a Schedule 13G on 10 Nov 2026.
  • Annual meeting of 4 Jun 2026 (Item 5.07): Dr. Kamal Ghaffarian re elected with 89.8% of votes cast and Stephen Altemus with 95.2%; Grant Thornton ratified with 99.9%. Dr. Christopher Scolese joined the board on 22 Oct 2026 after Michael Blitzer resigned.
  • Insiders, Forms 4 with transactions 13 Nov 2025 to 13 Nov 2026: no open market purchases; sales of about $263.8m. Advent sold $147.6m, Stephen Altemus $52.3m (3.10m shares, Dec 2025 to Apr 2026, partly under a 10b5‑1 plan), Dr. Kamal Ghaffarian $43.8m and Dr. Timothy Crain $18.0m.
Table 9.1 Annual meeting vote results, 4 Jun 2026
ProposalFor (m votes)Against (m votes)Abstain (m votes)For as % of votes castResult
Elect Dr. Kamal Ghaffarian (Class III, to 2029)196.022.3n/a89.8Elected
Elect Stephen Altemus (Class III, to 2029)207.810.6n/a95.2Elected
Ratify Grant Thornton LLP for FY2026246.60.30.499.9Ratified
Votes are voting power with Class C at three votes per share. Against column shows votes against. Broker non votes 28,971,750 on each director.

Annual meeting remarks

  • No management remarks, presentation or shareholder questions from the meeting of 4 Jun 2026 were filed; the Item 5.07 filing reports vote counts only.
Table 9.2 Holders and voting power, 10 Apr 2026
HolderClass A (m)Class C (m)Share of class (%)Share of votes (%)
Dr. Kamal Ghaffarian (Chairman)3.6435.6462.7 of Class C33.5
Stephen Altemus (CEO)1.1812.3421.7 of Class C11.6
Dr. Timothy Crain (CGO)0.368.8715.6 of Class C8.2
Advent International22.99n/a14.4 of Class A7.0
BlackRock9.45n/a5.9 of Class A2.9
2026 proxy statement: 159,961,860 Class A and 56,852,458 Class C shares at 10 Apr 2026. Class A carries 1 vote, Class C 3 votes. Advent sold 11,495,514 shares on 28 Jul 2026 (Form 4).
Table 9.3 Insider sales by holder, Forms 4 with transactions 13 Nov 2025 to 13 Nov 2026
HolderShares sold (m)Value ($m)
Advent International (10% owner)11.50147.6
Stephen Altemus, CEO3.1052.3
Dr. Kamal Ghaffarian, Chairman1.9443.8
Dr. Timothy Crain, CGO and CTO1.0318.0
Peter McGrath, CFO0.051.0
Total sales about $263.8m; no open market purchases. 22 of 53 insider filings carry the 10b5‑1 plan flag.

10 Risk Factors

  • Item 1A of the FY2025 10-K holds about 41 risk factors against 36 in the FY2024 10-K (20,390 words against 17,218). 7 factors were added, mostly on the convertible notes and the Lanteris acquisition, and 12 materially reworded. The Q3 2026 10-Q adds one factor on the UK operations acquired with Goonhilly.
Table 10.1 Risk factors with filed figures
RiskDisclosure and change
Customer concentrationThree customers 36%, 25% and 15% of Q3 2026 revenue; one customer 72% in Q3 2025 (10-Q).
Fixed price lunar contractsIM‑3 and IM‑4 in a loss position; 9M 2026 losses $9.1m and $17.6m; about 10% of CLPS contract price depends on a successful landing and is constrained to nil.
Government investigationsDOJ Civil Investigative Demand of 27 Oct 2026 under the False Claims Act; separate Lanteris cybersecurity investigation indemnified by the seller parent.
Launch dependenceMissions depend on launch vehicle integration with SpaceX (10-Q); IM‑3 and Altus‑1 planned for Mar/Apr 2027 (release); IM‑3 period of performance runs through Mar 2027.
Government fundingNASA and national security customers; shutdowns and continuing resolutions named as risks to awards and payments (10-Q MD&A).
Dilution$345m convertible notes at about $13.11 per share (about 26.3m shares); at the market program of up to $500m with $331.8m raised; warrant liabilities $51.4m.
Acquisition integrationNew 10-K factor on Lanteris integration; new 10-Q factor on UK operations, currency and cash repatriation after Goonhilly; goodwill $406.7m.
Pension obligationsNew factor from Lanteris defined benefit plans; pension and postretirement liability $43.0m at 30 Sep 2026.

How risk factors changed

  • Comparison: 10-K FY2025 filed 19 Mar 2026 acc 0001628280-26-019865 against 10-K FY2024 filed 25 Mar 2025 acc 0001844452-25-000023.
  • Lanteris appears 15 times in Item 1A of the FY2025 10-K against none a year earlier.
  • Convertible notes appear 41 times against none, with a new group of five factors.
  • Pension appears 15 times against 5, with a new pension and postretirement factor.
  • Item 1A grew from 17,218 to 20,390 words (+18%).
Figure 10.1 Risk factors by change against the prior filing
Table 10.2 Size of the risk factor section
Measure10-K FY202410-K FY2025
Risk factors (count)3641
Words in Item 1A17,21820,390
Table 10.3 Risk factors added, removed and materially reworded
ChangeRisk factorWhat changed
AddedAcquisitions and integration (Lanteris)New factor naming the Lanteris purchase agreement of 3 Nov 2025, closed 13 Jan 2026, and integration risk for acquired businesses.
AddedPension and postretirement obligationsNew with Lanteris, which maintains defined benefit pension and other postretirement plans; pension liability $43.0m at 30 Sep 2026.
AddedFunds to settle conversions or repurchasesNew group for the $345m 2.500% convertible notes due 2030 issued in Aug 2025.
AddedConditional conversion featureTriggered conversions could require cash settlement and reclassification of the notes as current.
AddedDilution from conversionsConversion price about $13.11 per share, 76.2631 shares per $1,000 note.
AddedCapped call transactionsHedging by capped call counterparties may affect the share and note prices.
AddedCapped call counterparty riskExposure to the credit of the capped call counterparties.
RemovedCommercial spaceflight market still emergingReplaced by a factor on the market for commercial space systems in cislunar space and beyond, which is counted as reworded; the old spaceflight wording no longer appears.
RemovedTermination of a government program (split text)Text merged into the government funding factor; counted as removed by the matching method.
RewordedManaging growthGrew from 463 to 1,235 words to cover the larger, acquired workforce and systems.
RewordedCybersecurity and third party systemsGrew from 378 to 1,542 words with ransomware and national security customer requirements.
RewordedCompetitionGrew from 333 to 471 words; adds satellite manufacturers alongside lunar providers.
RewordedGovernment shutdownsHeading now names shutdowns and funding disruptions.
RewordedCommercial space systems marketMarket framed as commercial space systems in cislunar space and beyond instead of commercial spaceflight.
RewordedUse of AIGrew from 168 to 250 words.
RewordedGovernment entity policies and fundingCut from 353 to 184 words.
RewordedOpen source and export controlsGrew from 688 to 1,838 words, incl. export authorisation and sanctions text.
RewordedIndebtednessNow covers the $345m convertible notes instead of the repaid bank loan.
RewordedEarnings guidanceCut from 489 to 72 words.
RewordedAccounting estimatesCut from 1,243 to 184 words.
RewordedTax Receivable AgreementGrew from 762 to 1,182 words.
Table 10.4 Risk factor updates in quarterly reports since the annual filing
FilingChange disclosed
10-Q Q3 2026 filed 12 Nov 2026One new factor: the Goonhilly acquisition adds UK operations, currency, tax and cash repatriation risk and integration into internal controls.

11 Stock Price, Scenarios & Sensitivity

  • LUNR closed at $13.03 on 12 Nov 2026, the day of the Q3 2026 release. 52 week closing high $45.70 in May 2026 and closing low $8.05 on 20 Nov 2025; the close is 71.5% below the 52 week high. Highest month end close in five years $43.83 (May 2026).
  • Valuation basis: EV/Sales. Market value $3.03bn on 232.4m Class A and Class C shares (5 Nov 2026, 10-Q cover); enterprise value $2.90bn after net cash of $126.9m (cash less the convertible notes at carrying value). EV/Sales 4.1x TTM revenue of $707.0m and 3.1x the FY2026 guidance midpoint of $935m. P/E is n/a on the TTM net loss.
  • Scenario method: implied price equals TTM Q3 2029 revenue times an exit EV/Sales multiple, plus net cash of $126.9m held at the 30 Sep 2026 level, divided by 255.7m shares (232.4m plus 10% for the convertible notes and the at the market program). TTM revenue holds only 8.5 months of Lanteris, so year one growth in each case partly reflects a full year of Lanteris.
Figure 11.1 LUNR monthly closing price and three year scenarios

Critical factors and core assumptions

Table 11.1 Critical factors behind the best case
FactorCurrent valueBest case requiresEvidence in filings
Backlog conversionbacklog $1.87bn; 40% to 45% expected in 2027conversion on schedule plus new awards above revenue10-Q Q3 2026
Satellite marginsLanteris Q3 margin before D&A 29.1%commercial and national security programs hold margins above 25%10-Q Q3 2026 MD&A
Lunar missionsIM‑3 94% complete, loss position; launch Mar/Apr 2027successful landings release constrained success payments10-Q Q3 2026; release
Golden Dome and SDAnational security 25.8% of Q3 revenuefollow on tranches after AMDT310-Q Q3 2026
Data networkAltus 1 in 2027, Altus 2 to 5 in 2028; Goonhilly ground networkrecurring NSN and data service revenue from 2027release 12 Nov 2026
Funding and dilutioncash $463.8m; $345m converts at $13.11positive free cash flow without new equity10-Q Q3 2026
  • Revenue base TTM Q3 2026 $707.0m; FY2026 guidance $920m to $950m; backlog $1.87bn.
  • Best case: 30% revenue CAGR from full year Lanteris, satellite awards and CLPS 2; exit EV/Sales 4.5x, near today's 4.1x.
  • Base case: 18% revenue CAGR with backlog converted as guided; exit EV/Sales 3.0x, near Redwire at 3.6x.
  • Worst case: 5% revenue CAGR with mission delays, contract losses and descoping; exit EV/Sales 1.5x.
  • Shares up 10% from 232.4m through convertible notes and the at the market program; no dividends or buybacks; net cash held at $126.9m.

Scenarios, three years forward

Table 11.2 Scenario analysis, TTM Q3 2026 to TTM Q3 2029
MeasureWorst caseBase caseBest case
Revenue CAGR, 3 years (%)5.018.030.0
Revenue, TTM Q3 2029 ($bn)0.81.21.6
Exit EV/Sales (x)1.53.04.5
Implied price ($)5.3014.1327.84
Change against $13.03 (%)(59)8114
Implied annual return (%)(25.9)2.728.8
DescriptionMission delays and contract lossesBacklog converts as guidedLanteris growth plus CLPS 2 and Golden Dome
Implied price = (TTM Q3 2029 revenue x exit EV/Sales plus net cash $126.9m) / 255.7m shares. Margins do not enter the EV/Sales calculation. Change and return are measured against the close of $13.03 on 12 Nov 2026.
Figure 11.2 Three year price scenarios

Sensitivity analysis

Table 11.3 Sensitivity of implied price to revenue CAGR and exit EV/Sales
Revenue CAGR \ EV/Sales1.5x2x3x4x4.5x
5%$5.30$6.90$10.10$13.30$14.90
12%$6.32$8.27$12.15$16.04$17.98
18%$7.31$9.58$14.13$18.67$20.94
24%$8.41$11.04$16.31$21.59$24.22
30%$9.61$12.65$18.72$24.80$27.84
Cells show implied share price in year 3. Close of 12 Nov 2026 $13.03. Blue cells sit above it, red cells below. EV/Sales basis on TTM Q3 2029 revenue; net cash held flat; shares up 10%.

Disclaimer

This analysis is for information only and is not financial advice. It is derived from public SEC filings retrieved via sec-api.io and is not a publication of the U.S. Securities and Exchange Commission. Scenario values are model outputs under stated assumptions and are not forecasts. Data as of 13 November 2026.

Sources

All company and peer figures are read from SEC filings retrieved through the sec api.io MCP server. Share prices are regular session closes as dated in the text.

Table A.1 Filings used, with accession numbers
FormPeriodFiledAccession number
8-K Ex 99.1Q3 202612 Nov 20260001628280-26-073106
10-QQ3 202612 Nov 20260001628280-26-073512
8-K Ex 99.1Q2 202613 Aug 20260001628280-26-056476
10-QQ2 202613 Aug 20260001628280-26-056821
8-K Ex 99.1, 99.2Q1 202614 May 20260001628280-26-034807
10-QQ1 202614 May 20260001628280-26-035236
8-K Ex 99.1Q4 202519 Mar 20260001628280-26-019633
10-KFY202519 Mar 20260001628280-26-019865
8-K/A Ex 99.1, 99.2Lanteris FY2025 and pro forma1 Apr 20260001193125-26-137898
8-K Ex 99.1Q3 2025 and Lanteris agreement4 Nov 20250001193125-25-263400
8-K Ex 99.1Q2 20257 Aug 20250001844452-25-000051
8-K Ex 99.1Q1 202513 May 20250001844452-25-000040
10-KFY202425 Mar 20250001844452-25-000023
10-KFY202325 Mar 20240001844452-24-000036
DEF 14A2026 annual meeting24 Apr 20260001628280-26-027022
8-K Item 5.072026 annual meeting8 Jun 20260001628280-26-041526
Table A.2 Peer filings used
CompanyFormFiledAccession number
AST SpaceMobile10-Q9 Nov 20260001193125-26-453759
Firefly Aerospace10-Q10 Nov 20260001860160-26-000031
Redwire10-Q5 Nov 20260001819810-26-000142
Rocket Lab10-Q9 Nov 20260001819994-26-000074
Table B.1 Exhibits to Forms 8-K filed in the last twelve months
FiledExhibitDocumentContent
4 Nov 2025Ex 99.1Lanteris acquisition agreement and Q3 2025 highlightsPrice $800m: $450m cash and $350m of Class A shares; combined LTM revenue above $850m and backlog $920m at 30 Sep 2025; Lanteris LTM revenue about $630m with double digit adjusted EBITDA margins and $685m backlog
4 Nov 2025Ex 2.1Lanteris membership interest purchase agreementPurchase of Lanteris Space Holdings LLC from Advent International; consideration in cash and Class A shares, subject to adjustment
4 Nov 2025Ex 10.1Registration rights agreement with the sellerResale registration of the Class A shares issued to the Lanteris seller
13 Jan 2026Ex 99.1Lanteris acquisition completedCompleted for $800m before closing adjustments, $450m cash and $350m in Class A shares; Lanteris LEO, MEO and GEO satellites serve missile warning and tracking, ISR, Earth observation and space domain awareness
13 Jan 2026Ex 10.1 to 10.3Orbital receivables facility and related agreementsGuarantee of the ING orbital receivables purchase facility of up to $250m through 1 Dec 2026
25 Feb 2026Ex 99.1$175m strategic equity investment11,574,069 Class A shares at $15.12; proceeds for Near Space Network Services, the Lanteris 1300 series platform and in space data processing; Named target programs: Golden Dome, TDRSS replacement, Mars Telecommunications Orbiter
25 Feb 2026Ex 10.1Securities purchase agreementResale registration statement due by 1 Apr 2026
27 Feb 2026Ex 10.1Registration rights agreementPlacement of $175m closed on 27 Feb 2026
19 Mar 2026Ex 99.1Q4 and FY2025 resultsQ4 2025 revenue $44.8m, gross margin 19%; FY2025 revenue $210.1m, net loss $106.8m, adjusted EBITDA ($64.2m); FY2026 outlook: revenue $900m to $1bn and positive adjusted EBITDA; combined February month end backlog about $943m
1 Apr 2026Ex 99.1Lanteris audited FY2025 financial statementsLanteris revenue $601m in FY2025 against $722m in FY2024; operating loss $2m after a $35m impairment; net loss $3m
1 Apr 2026Ex 99.2Pro forma combined financial informationPro forma combined FY2025 revenue $811.1m ($210.1m Intuitive Machines plus $601m Lanteris)
14 May 2026Ex 99.1Q1 2026 resultsRevenue $186.7m incl. Lanteris from 13 Jan 2026; 12 days of Lanteris (about $13m) not included; Adjusted EBITDA $2.7m; backlog $1.06bn; $428.9m of new contracts incl. a $180.4m CLPS task order
14 May 2026Ex 99.2Agreement to buy Goonhilly Earth Station and COMSATAdds 44 antennas over two continents incl. the GHY6 32 metre and GHY3 30 metre dishes; Closing subject to UK National Security and Investment Act and FCC approvals
3 Jun 2026Ex 1.1At the market sales agreementUp to $500m of Class A shares through ten agents; commission up to 3.0%; $331.8m net raised in Q2 and Q3 2026 (10-Q)
3 Jun 2026Ex 5.1Legal opinion on the at the market sharesValidity opinion for shares under Form S-3
3 Aug 2026Ex 99.1Goonhilly and COMSAT acquisition completedGround stations in the UK and US for IM‑3 and Altus‑1; COMSAT runs over 90 hosted and leased antennas; Consideration $32.2m: $20.4m cash and 960,649 shares (10-Q)
13 Aug 2026Ex 99.1Q2 2026 resultsRevenue $206.2m; backlog $1.76bn; $920m of Q2 awards and $300m in Q3 to date; $600m+ contract for three commercial GEO satellites; sixth CLPS award; national security 30% of Q2 revenue against 3%
22 Oct 2026Ex 99.1Board changeDr. Christopher Scolese joins the board (NRO Director 2019 to 2026, NASA Goddard Director 2012 to 2019); Michael Blitzer resigned
12 Nov 2026Ex 99.1Q3 2026 resultsRevenue $269.3m, gross margin $69m (26%), cash from operations $66m, capex $33m, free cash flow $33m; Backlog $1.87bn; $450m of new awards and Goonhilly backlog in Q3; FY2026 revenue outlook $920m to $950m